Two-stage medical supply chain scheduling with an assignable common due window and shelf life

被引:0
|
作者
Long Zhang
Yuzhong Zhang
Qingguo Bai
机构
[1] Qufu Normal University,Institute of Operations Research, School of Management
来源
关键词
Medical supply chain scheduling; Shelf life; Due window assignment; -hard; Pseudo-polynomial-time algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers a two-stage medical supply chain scheduling problem from the perspective of the medicine manufacturer in which jobs have an assignable common due window and shelf life. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due window under a given schedule. The job’s holding time, which is the time interval that passes from the completion time of the job to the delivery date of the job in the batch, must be no more than its shelf life. The objective is to minimize the total cost comprising earliness, weighted number of tardy jobs, holding time, due window starting time, window size, and batch delivery. We first show that the problem is NP-hard and then provide a pseudo-polynomial-time algorithm. We also prove that a special case of the problem can be optimally solved in polynomial time.
引用
收藏
页码:319 / 329
页数:10
相关论文
共 50 条
  • [1] Two-stage medical supply chain scheduling with an assignable common due window and shelf life
    Zhang, Long
    Zhang, Yuzhong
    Bai, Qingguo
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (01) : 319 - 329
  • [2] An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time
    Long Zhang
    Yuzhong Zhang
    Qingguo Bai
    Journal of Combinatorial Optimization, 2022, 44 : 2167 - 2179
  • [3] An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time
    Zhang, Long
    Zhang, Yuzhong
    Bai, Qingguo
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 44 (04) : 2167 - 2179
  • [4] Two-stage flowshop earliness and tardiness machine scheduling involving a common due window
    Yeung, WK
    Oguz, C
    Cheng, TCE
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (03) : 421 - 434
  • [5] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [6] Two-Stage Supply Chain Scheduling with an Option of Outsourcing in Stage One
    Qi, Xiangtong
    2008 5TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2008, : 248 - 253
  • [7] Single-machine batch delivery scheduling with an assignable common due window
    Yin, Yunqiang
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Wu, Chin-Chia
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (02): : 216 - 225
  • [8] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [9] Preemptive scheduling in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Fan, Wenjuan
    Pardalos, Panos M.
    Liu, Xinbao
    Goldengorin, Boris
    Yang, Shanlin
    OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (04): : 727 - 747
  • [10] Joint cyclic production and delivery scheduling in a two-stage supply chain
    Pundoor, Guruprasad
    Chen, Zhi-Long
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 119 (01) : 55 - 74