Two-Stage Supply Chain Scheduling with an Option of Outsourcing in Stage One

被引:0
|
作者
Qi, Xiangtong [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Kowloon, Hong Kong, Peoples R China
关键词
outsourcing; scheduling; supply chain;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper studies a two-stage supply chain scheduling problem with n job orders where each job needs two sequential operations. In addition to the two in-house machines each for one operation, the manufacturer has another option of outsourcing some stage-one operations to an outside subcontractor. The jobs with their stage-one operation outsourced are subject to a single batch delivery from the subcontractor before their respective stage-two operations can be started in-house. The problem is to design an integrated scheduling that considers both the in-house production and the outsourcing with the aim of optimally balancing the outsourcing cost and the makespan. The problem is NP-hard. We have developed a heuristic algorithm to solve the problem, and conducted computational experiments to validate our model and algorithm.
引用
收藏
页码:248 / 253
页数:6
相关论文
共 50 条
  • [1] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497
  • [2] An improved algorithm for a two-stage production scheduling problem with an outsourcing option
    Jiang, Xiaojuan
    Zhang, An
    Chen, Yong
    Chen, Guangting
    Lee, Kangbok
    [J]. Theoretical Computer Science, 2021, 876 : 59 - 69
  • [3] TWO-STAGE PRODUCTION SCHEDULING WITH AN OPTION OF OUTSOURCING FROM A REMOTE SUPPLIER
    Qi, Xiangtong
    [J]. JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2009, 18 (01) : 1 - 15
  • [4] An improved algorithm for a two-stage production scheduling problem with an outsourcing option
    Jiang, Xiaojuan
    Zhang, An
    Chen, Yong
    Chen, Guangting
    Lee, Kangbok
    [J]. THEORETICAL COMPUTER SCIENCE, 2021, 876 : 59 - 69
  • [5] Two-stage production scheduling with an option of outsourcing from a remote supplier
    Xiangtong Qi
    [J]. Journal of Systems Science and Systems Engineering, 2009, 18 : 1 - 15
  • [6] TWO-STAGE PRODUCTION SCHEDULING WITH AN OPTION OF OUTSOURCING FROM A REMOTE SUPPLIER
    Xiangtong QI Department of Industrial Engineering and Logistics Management
    [J]. Journal of Systems Science and Systems Engineering, 2009, 18 (01) : 1 - 15
  • [7] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [8] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [9] Preemptive scheduling in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Fan, Wenjuan
    Pardalos, Panos M.
    Liu, Xinbao
    Goldengorin, Boris
    Yang, Shanlin
    [J]. OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (04): : 727 - 747
  • [10] Outsourcing Strategies in a Two-Stage Supply Chain Model with Insufficient Production Capacity
    Das, Debabrata
    Hui, Nirmal Baran
    [J]. ADVANCES IN MATERIALS AND MANUFACTURING ENGINEERING, ICAMME 2019, 2020, : 223 - 229