Joint cyclic production and delivery scheduling in a two-stage supply chain

被引:39
|
作者
Pundoor, Guruprasad [2 ]
Chen, Zhi-Long [1 ]
机构
[1] Univ Maryland, Robert H Smith Sch Business, College Pk, MD 20742 USA
[2] ILOG Inc, Sunnyvale, CA 94087 USA
基金
美国国家科学基金会;
关键词
Two-stage supply chain; Production-distribution integration; Cyclic scheduling; Value of warehouse; ECONOMIC-LOT; REPLENISHMENT PROBLEM; ASSEMBLY SYSTEMS; COMMON CYCLE; PRODUCTION COSTS; INVENTORY; VENDOR; TRANSPORTATION; POLICIES; COORDINATION;
D O I
10.1016/j.ijpe.2009.01.007
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We Study an integrated production and distribution scheduling model in a two-stage supply chain consisting of one or more suppliers, a warehouse, and a customer. Each Supplier produces a different product at a constant rate. There is a setup time and a setup cost per production run for each supplier. Completed products are first delivered from the suppliers to the warehouse and are then sent from the warehouse to the customer. The Customer's demand for each product is constant over time. The problem is to find jointly a cyclic production schedule for each supplier, a cyclic delivery schedule from each supplier to the warehouse, and a cyclic delivery schedule from the warehouse to the Customer so that the customer demand for each product is satisfied without backlog at the least total production, inventory and distribution cost. We consider two production and delivery scheduling policies. We derive either an exact or a heuristic solution algorithm for the problem under each policy. Heuristics are evaluated computationally. We also evaluate the value of the warehouse by comparing our model with a model that does not have the warehouse in the supply chain (i.e. the products are delivered directly from the suppliers to the customer). Various managerial insights based on an extensive set of computational tests are reported, including how the Value of warehouse and the delivery frequency from the suppliers to the warehouse are influenced by various problem parameters including production rates of the suppliers. unit inventory costs, delivery costs, and the warehouse location. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:55 / 74
页数:20
相关论文
共 50 条
  • [1] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [2] INTEGRATING PRODUCTION SCHEDULING, DELIVERY, AND 3D LOADING PROBLEMS IN A TWO-STAGE SUPPLY CHAIN
    Keshavarz, Taha
    Noormohamadzade, Zohre
    Fakhrzad, Mohammad Bagher
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2020, 27 (06): : 906 - 932
  • [3] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [4] Delivery performance improvement in two-stage supply chain
    Bushuev, Maxim A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 195 : 66 - 73
  • [5] Two-Stage Supply Chain Scheduling with an Option of Outsourcing in Stage One
    Qi, Xiangtong
    [J]. 2008 5TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2008, : 248 - 253
  • [6] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Zegordi, Seyed Hessameddin
    Nia, Mohammad Ali Beheshti
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 928 - 939
  • [7] A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
    Zegordi, S. H.
    Abadi, I. N. Kamal
    Nia, M. A. Beheshti
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) : 373 - 381
  • [8] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [9] Preemptive scheduling in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Fan, Wenjuan
    Pardalos, Panos M.
    Liu, Xinbao
    Goldengorin, Boris
    Yang, Shanlin
    [J]. OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (04): : 727 - 747
  • [10] The impact of delivery lot splitting on delivery reliability in a two-stage supply chain
    Van Nieuwenhuyse, Inneke
    Vandaele, Nico
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) : 694 - 708