Manufacturing intelligence to forecast and reduce semiconductor cycle time

被引:0
|
作者
Chen-Fu Chien
Chia-Yu Hsu
Chih-Wei Hsiao
机构
[1] National Tsing Hua University,Department of Industrial Engineering and Engineering Management
[2] Yuan Ze University,Department of Information Management
来源
关键词
Cycle time; Work in process (WIP); Manufacturing intelligence; Gauss-Newton regression; Back-propagation neural network; Semiconductor;
D O I
暂无
中图分类号
学科分类号
摘要
Semiconductor manufacturing is one of the most complicated production processes with the challenges of dynamic job arrival, job re-circulation, shifting bottlenecks, and lengthy fabrication process. Owing to the lengthy wafer fabrication process, work in process (WIP) usually affects the cycle time and throughput in the semiconductor fabrication. As the applications of semiconductor have reached the era of consumer electronics, time to market has played an increasingly critical role in maintaining a competitive advantage for a semiconductor company. Many past studies have explored how to reduce the time of scheduling and dispatching in the production cycle. Focusing on real settings, this study aims to develop a manufacturing intelligence approach by integrating Gauss-Newton regression method and back-propagation neural network as basic model to forecast the cycle time of the production line, where WIP, capacity, utilization, average layers, and throughput are rendered as input factors for indentifying effective rules to control the levels of the corresponding factors as well as reduce the cycle time. Additionally, it develops an adaptive model for rapid response to change of production line status. To evaluate the validity of this approach, we conducted an empirical study on the demand change and production dynamics in a semiconductor foundry in Hsinchu Science Park. The approach proved to be successful in improving forecast accuracy and realigning the desired levels of throughput in production lines to reduce the cycle time.
引用
收藏
页码:2281 / 2294
页数:13
相关论文
共 50 条
  • [31] Techniques to reduce robot manufacturing cycle times
    Welding Design and Fabrication, 2008, 81 (09):
  • [32] QUALIFICATION MANAGEMENT TO REDUCE WORKLOAD VARIABILITY IN SEMICONDUCTOR MANUFACTURING
    Rowshannahad, Mehdi
    Dauzere-Peres, Stephane
    Cassini, Bernard
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2434 - 2443
  • [33] ENHANCEMENT OF SIMULATION-BASED SEMICONDUCTOR MANUFACTURING FORECAST QUALITY THROUGH HYBRID TOOL DOWN TIME MODELING
    Preuss, Patrick
    Naumann, Andre
    Scholl, Wolfgang
    Gan, Boon Ping
    Lendermann, Peter
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2444 - 2453
  • [34] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing
    Shing-Ko Liang
    Chia-Nan Wang
    The International Journal of Advanced Manufacturing Technology, 2005, 26 : 645 - 652
  • [35] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing
    Liang, SK
    Wang, CN
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (5-6): : 645 - 652
  • [36] A short-term forecast method for demand quantities in semiconductor manufacturing
    Habla, C.
    Driessel, R.
    Moench, L.
    Ponsignon, T.
    Ehm, H.
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1-3, 2007, : 338 - 343
  • [37] Litho area cycle time reduction in an advanced 300mm semiconductor manufacturing line
    van der Eerden, Joris
    Saenger, Tim
    Walbrick, Walter
    Niesing, Henk
    Schuurhuis, Ron
    2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 114 - +
  • [38] Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing
    Johnson, RT
    Yang, F
    Ankenman, BE
    Nelson, BL
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1951 - 1955
  • [39] Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing
    Fronckowiak, D
    Peikert, A
    Nishinohara, K
    1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 151 - 155
  • [40] Precise time synchronization in semiconductor manufacturing
    Anandarajah, Vinod
    Kalappa, Naveen
    Sangole, Rahul
    Hussaini, Sulaiman
    Li, Ya-Shian
    Baboud, Julien
    Moyne, James
    2007 IEEE INTERNATIONAL SYMPOSIUM ON PRECISION CLOCK SYNCHRONIZATION FOR MEASUREMENT CONTROL AND COMMUNICATION, 2007, : 78 - +