Investigation of effects of dynamic loads in metro tunnels during construction and operation on existing buildings

被引:0
|
作者
Mücahit Namli
Fuat Aras
机构
[1] Istanbul Medeniyet University,Faculty of Engineering and Naturel Sciences, Department of Civil Engineering
[2] The University of Texas at Arlington,Center for Underground Infrastructure Research & Education (CUIRE), Department of Civil Engineering
来源
关键词
Acceleration measurement; Metro (subway); Tunnel; Tunnel boring machine (TBM); Vibration survey;
D O I
暂无
中图分类号
学科分类号
摘要
This study focuses on the vibration effects of both metro (subway) tunnel construction and metro-operating traffic on existing buildings. To that end, a four-story reinforced concrete building located between two metro tunnels of Üsküdar–Ümraniye–Çekmeköy Metro Project (UUCMP) was monitored both during the tunneling stages of construction and after the metro traffic started. Acceleration records were gathered from the building during the pass of two tunnel boring machines (TBMs) just below the building. Both magnitudes of the acceleration and the building frequencies were investigated for the active and passive stages of TBMs. The operation of the first TBM caused an obvious increase in the magnitudes of the vibration measured from the building, while the operation of the second TBM did not show any meaningful increase in the vibration magnitudes. These data were evaluated together with the characteristics of the soil between the building and the metro tunnels. After the completion of the construction, the metro lines were put into service. In this stage, acceleration measurements were gathered to reveal the effects of metro traffic on the studied building as well. It was seen that the metro traffic increased the magnitude of the vibration on the building. Firstly, this study underlined the importance of the soil profile between the tunnels and the studied structures for the propagation of TBM-induced vibrations. Secondly, in both tunnels, daily metro traffic caused higher magnitudes of vibration on the studied building compared with those of the TBMs. In conclusion, TBM vibration data can be used for detecting and determining critical structures in order to take precautions during the construction stage before the metro lines are put into service.
引用
收藏
相关论文
共 50 条
  • [41] The FEM Analysis of Influence of Metro Construction and Operation on the Historic Buildings Considering Soil-structure Interaction
    Wang Xin
    Liu Zengrong
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 585 - 588
  • [42] Numerical Investigation on the Influence of Super-Large-Diameter Shield Tunneling on Nearby Existing Metro Tunnels and the Protection Scheme
    Li, Yixiang
    Zou, Zongxing
    APPLIED SCIENCES-BASEL, 2023, 13 (24):
  • [43] Field-monitoring and numerical investigation of a super-large-diameter shield tunnel undercrossing existing metro tunnels
    Qin, P.
    Su, Z.
    Zhou, C.
    Xie, J.
    Huang, X.
    GEOSHANGHAI 2024 INTERNATIONAL CONFERENCE, VOL 4, 2024, 1333
  • [44] The effect of internal structure on dynamic response of road-metro tunnels under train vibration loads: An experimental study
    Guo, Wenqi
    Yang, Wenbo
    Qian, Zhihao
    Yang, Linlin
    He, Chuan
    Qu, Shuai
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 138
  • [45] Application of the excavation methodology for phases in the construction of tunnels in conditions of low urban coverage during the construction of the completion works of the Paris metro
    Guadagnini, G.
    Orci, C.
    Bondi, S.
    Puccinelli, M.
    Dallari, A.
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2014, (109): : 45 - 48
  • [46] Safety Risks and Protection Measures for City Wall during Construction and Operation of Xi'an Metro
    Qiu, Junling
    Qin, Yiwen
    Feng, Zhihua
    Wang, Lixin
    Wang, Ke
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (02)
  • [47] Dynamic monitoring of buildings as a diagnostic tool during construction phases
    Nicoletti, Vanni
    Arezzo, Davide
    Carbonari, Sandro
    Gara, Fabrizio
    JOURNAL OF BUILDING ENGINEERING, 2022, 46
  • [48] Real-Time Safety Risk Identification Model during Metro Construction Adjacent to Buildings
    Zhang, Sherong
    Shang, Chao
    Wang, Chao
    Song, Ran
    Wang, Xiaohua
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (06)
  • [49] Book review: Accident and emergency situations during the construction and operation of transportation and subway tunnels
    Vlasov, S.N.
    Merkin, Y.Y.
    Makovsky, L.V.
    T&T International, 1997, 29 (10):
  • [50] Effects of voids on the dynamic response of tunnels under train-induced vibration loads
    Yang, Wenbo
    Ma, Gaoyu
    Tu, Jiulin
    Kou, Hao
    Zhang, Yanyang
    Fang, Yong
    He, Chuan
    INTERNATIONAL JOURNAL OF PHYSICAL MODELLING IN GEOTECHNICS, 2023, 23 (02) : 77 - 91