Investigation of effects of dynamic loads in metro tunnels during construction and operation on existing buildings

被引:0
|
作者
Mücahit Namli
Fuat Aras
机构
[1] Istanbul Medeniyet University,Faculty of Engineering and Naturel Sciences, Department of Civil Engineering
[2] The University of Texas at Arlington,Center for Underground Infrastructure Research & Education (CUIRE), Department of Civil Engineering
来源
关键词
Acceleration measurement; Metro (subway); Tunnel; Tunnel boring machine (TBM); Vibration survey;
D O I
暂无
中图分类号
学科分类号
摘要
This study focuses on the vibration effects of both metro (subway) tunnel construction and metro-operating traffic on existing buildings. To that end, a four-story reinforced concrete building located between two metro tunnels of Üsküdar–Ümraniye–Çekmeköy Metro Project (UUCMP) was monitored both during the tunneling stages of construction and after the metro traffic started. Acceleration records were gathered from the building during the pass of two tunnel boring machines (TBMs) just below the building. Both magnitudes of the acceleration and the building frequencies were investigated for the active and passive stages of TBMs. The operation of the first TBM caused an obvious increase in the magnitudes of the vibration measured from the building, while the operation of the second TBM did not show any meaningful increase in the vibration magnitudes. These data were evaluated together with the characteristics of the soil between the building and the metro tunnels. After the completion of the construction, the metro lines were put into service. In this stage, acceleration measurements were gathered to reveal the effects of metro traffic on the studied building as well. It was seen that the metro traffic increased the magnitude of the vibration on the building. Firstly, this study underlined the importance of the soil profile between the tunnels and the studied structures for the propagation of TBM-induced vibrations. Secondly, in both tunnels, daily metro traffic caused higher magnitudes of vibration on the studied building compared with those of the TBMs. In conclusion, TBM vibration data can be used for detecting and determining critical structures in order to take precautions during the construction stage before the metro lines are put into service.
引用
收藏
相关论文
共 50 条
  • [21] Automatic monitoring of effects of excavation of group foundation pits on existing adjacent metro tunnels
    Cao, Quan
    Li, Qin-Ming
    Xiang, Wei
    Jia, Hai-Liang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2012, 34 (SUPPL.): : 552 - 556
  • [22] Influence of Pile Foundation Construction on Existing Tunnels in a Metro Protection Area: Field Test and Numerical Simulation
    Lin, Gang
    Ke, Wenbin
    Guo, Shuaishuai
    Lin, Zhaorui
    Xu, Changjie
    Chi, Minliang
    Xiao, Yue
    BUILDINGS, 2024, 14 (08)
  • [23] A Tale of Two Tunnels-Understanding the Performance of Existing and New Tunnels during Construction Works
    Elshafie, Mohammed Z. E. B.
    Gue, Chang Ye
    De Battista, Nicky
    Alhaddad, Mehdi
    Wilcock, Matthew
    Soga, Kenichi
    Mair, Robert J.
    STRUCTURAL HEALTH MONITORING 2015: SYSTEM RELIABILITY FOR VERIFICATION AND IMPLEMENTATION, VOLS. 1 AND 2, 2015, : 1575 - 1582
  • [24] Test for effects of metro train-induced vibration on existing masonry buildings
    Xia, Qian
    Qu, Wen-Jun
    Shang, Xiao-Dong
    Zhendong yu Chongji/Journal of Vibration and Shock, 2013, 32 (12): : 11 - 16
  • [25] STUDY OF THE INFLUENCE OF METRO LOADS ON THE DESTRUCTION OF NEARBY BUILDINGS AND CONSTRUCTION STRUCTURES USING BIM TECHNOLOGIES
    Bashynskyi, Yaroslav
    Barabash, Maria
    Bieliatynskyi, Andrii
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2023, 29 (08) : 714 - 728
  • [26] Effects of the construction sequence of twin tunnels at different depths on an existing pile
    Ng, C. W. W.
    Lu, H.
    CANADIAN GEOTECHNICAL JOURNAL, 2014, 51 (02) : 173 - 183
  • [27] Investigation of wind loads and dynamic responses on tall buildings and structures
    Zhang, Liangliang
    Luo, Yongning
    Liuti Lixue Shiyan yu Celiang/Experiments and Measurements in Fluid Mechanics, 2000, 14 (01): : 85 - 89
  • [28] SUBSTANTIATION OF TECHNOLOGICAL SOLUTIONS FOR THE SAFETY AND OPERATIONAL RELIABILITY OF EXISTING METRO TUNNELS FALLING INTO THE ZONE OF INFLUENCE OF NEW CONSTRUCTION
    Pankratenko, A. N.
    Tsyupa, D. A.
    PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2023, 2 : 367 - 373
  • [29] Mechanical responses of underground carriageway structures due to construction of metro tunnels beneath the existing structure: A case study
    Han, Xin
    Ye, Fei
    Han, Xingbo
    Ren, Chao
    Song, Jing
    Zhao, Ruliang
    DEEP UNDERGROUND SCIENCE AND ENGINEERING, 2024, 3 (02) : 231 - 246
  • [30] Mechanical responses of underground carriageway structures due to construction of metro tunnels beneath the existing structure: A case study
    Xin Han
    Fei Ye
    Xingbo Han
    Chao Ren
    Jing Song
    Ruliang Zhao
    DeepUndergroundScienceandEngineering, 2024, 3 (02) : 231 - 246