The ANP-Fuzzy-TOPSIS model for the optimization of the scheme of large-section blasting

被引:0
|
作者
Zhengyu Wu
Qiyue Li
Deguo Kong
Guan Chen
Dayou Luo
机构
[1] Central South University,School of resources and safety engineering
[2] Wuhan University,School of Water Conservancy and Hydropower
来源
关键词
Cut scheme; Evaluation index; Analytic network process (ANP); Fuzzy theory; Technique for order preference by similarity to ideal solution (TOPSIS); Comprehensive evaluation model;
D O I
暂无
中图分类号
学科分类号
摘要
In view of the difficulty of decision-making in the scheme selection of a bauxite mine in extensive section blasting, it is combined with analytic network process (ANP), fuzzy theory, and TOPSIS theory. The establishment of ANP-Fuzzy-TOPSIS comprehensive evaluation index system of comprehensive evaluation model can optimize the 3 selections of blasting scheme. From the 10 indicators of careful consideration of the impact of blasting scheme selection factors of 3 aspects of economy, technology, and safety, through the analytic hierarchy process, it objectively determines the weight vector of each evaluation index. Then, combined with the theory of fuzzy mathematics and the ideal construction of ANP-Fuzzy-TOPSIS comprehensive evaluation model solution method principle, the comprehensive evaluation index of each scheme calculate is calculated based on the superior degree. The selected cutting scheme is superior to 49.8%, 51.3%, and 48.4% to determine the second kinds of blasting scheme (double wedge cut) optimal. The results of this study are consistent with the results of BP neural network method, catastrophe progression method, and AHP-TOPSIS model, which prove the feasibility of the model.
引用
收藏
相关论文
共 50 条
  • [41] Developing an empirical model to test whether required writing exercises or other changes in large-section law class teaching methodologies result in improved exam performance
    Curcio, Andrea A.
    Jones, Gregory Todd
    Washington, Tanya M.
    JOURNAL OF LEGAL EDUCATION, 2007, 57 (02) : 195 - 204
  • [42] An interval type-2 fuzzy TOPSIS model for large scale group decision making problems with social network information
    Wu, Tong
    Liu, Xinwang
    Liu, Fang
    INFORMATION SCIENCES, 2018, 432 : 392 - 410
  • [43] An input/output model reduction-based optimization scheme for large-scale systems
    Luna-Ortiz, E
    Theodoropoulos, C
    MULTISCALE MODELING & SIMULATION, 2005, 4 (02): : 691 - 708
  • [44] Fuzzy Model Predictive Control contrived for Type-2 Large-Scale Process Based On Hierarchical Scheme
    Sarbaz, Mohammad
    Zamani, Iman
    Manthouri, Mohammad
    2020 28TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2020, : 1299 - 1304
  • [45] Fuzzy Clustering Based Gaussian Process Model for Large Training Set and Its Application in Expensive Evolutionary Optimization
    Liu, Wudong
    Zhang, Qingfu
    Tsang, Edward
    Virginas, Botond
    2009 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-5, 2009, : 2411 - +
  • [46] A global optimization feedback model with PSO for large scale group decision making in hesitant fuzzy linguistic environments
    Zhao, Meng-Ke
    Guo, Ji
    Wu, Jian
    Xu, Ze-Shui
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 228
  • [47] Dynamic model Scheme Optimization Based on Fuzzy Decision Theory of Self-anchored Cable-stayed Suspension Bridge
    Miao, Feng
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 538 - 541
  • [48] Multi-attribute grey fuzzy optimized decision-making model of large-scale hydraulic turbine design scheme
    School of Mechantronics Engineering, Harbin Institute of Technology, Harbin 150001, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2008, 10 (1905-1912):
  • [49] Dynamic Isolation Model Scheme Optimization Based on Fuzzy Decision Theory of Self-anchored Cable-stayed Suspension Bridge
    Mu, Yingna
    Shi, Lei
    Miao, Feng
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1162 - +
  • [50] Fuzzy Bicriteria Optimization Model for Fault Tolerant Distributed Embedded Systems Under Reuse-or-Build-or-Buy Strategy Incorporating Recovery Block Scheme
    Kaur, Ramandeep
    Arora, Stuti
    Jha, P. C.
    PROCEEDINGS OF FIFTH INTERNATIONAL CONFERENCE ON SOFT COMPUTING FOR PROBLEM SOLVING (SOCPROS 2015), VOL 2, 2016, 437 : 975 - 989