The ANP-Fuzzy-TOPSIS model for the optimization of the scheme of large-section blasting

被引:0
|
作者
Zhengyu Wu
Qiyue Li
Deguo Kong
Guan Chen
Dayou Luo
机构
[1] Central South University,School of resources and safety engineering
[2] Wuhan University,School of Water Conservancy and Hydropower
来源
关键词
Cut scheme; Evaluation index; Analytic network process (ANP); Fuzzy theory; Technique for order preference by similarity to ideal solution (TOPSIS); Comprehensive evaluation model;
D O I
暂无
中图分类号
学科分类号
摘要
In view of the difficulty of decision-making in the scheme selection of a bauxite mine in extensive section blasting, it is combined with analytic network process (ANP), fuzzy theory, and TOPSIS theory. The establishment of ANP-Fuzzy-TOPSIS comprehensive evaluation index system of comprehensive evaluation model can optimize the 3 selections of blasting scheme. From the 10 indicators of careful consideration of the impact of blasting scheme selection factors of 3 aspects of economy, technology, and safety, through the analytic hierarchy process, it objectively determines the weight vector of each evaluation index. Then, combined with the theory of fuzzy mathematics and the ideal construction of ANP-Fuzzy-TOPSIS comprehensive evaluation model solution method principle, the comprehensive evaluation index of each scheme calculate is calculated based on the superior degree. The selected cutting scheme is superior to 49.8%, 51.3%, and 48.4% to determine the second kinds of blasting scheme (double wedge cut) optimal. The results of this study are consistent with the results of BP neural network method, catastrophe progression method, and AHP-TOPSIS model, which prove the feasibility of the model.
引用
收藏
相关论文
共 50 条
  • [31] The Economic Optimization of Mining Support Scheme Based on Optimal Fuzzy Model
    Wang Min
    Ru Zhong liang
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 654 - 658
  • [32] Optimization of the scheme for natural ecology planning of urban rivers based on ANP (analytic network process) model
    Zhang, Yichuan
    Wang, Jiangping
    JOURNAL OF ENVIRONMENTAL BIOLOGY, 2015, 36 (04): : 755 - 763
  • [33] The Assessment of Water Quality in the Ningxia Section of the Yellow River Using Intuitionistic Fuzzy Sets-TOPSIS Model
    Wu, Qi-Hong
    Gao, Lei
    Gu, Xin-Bao
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2022, 31 (06): : 5905 - 5914
  • [34] Fuzzy optimization model of support scheme for deep foundation pit and its application
    Zhang, Shanggen
    Cheng, Canshou
    Xia, Yan
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2004, 23 (12): : 2046 - 2048
  • [35] Stability evaluation of the sequential excavation method of large-section double-arch tunnel in fly ash accumulation stratum through physical model
    Yu, Tao
    Ying, Kaichen
    Wang, Jianfeng
    Yao, Zhigang
    Fang, Yong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 158
  • [36] RESEARCH ON OPTIMIZATION OF MOTORWAY ROUTE DESIGN SCHEME IN MOUNTAIN AREAS BASED ON ENTROPY WEIGHT-TOPSIS MODEL
    Meng, Yunwei
    Quan, Zhenyu
    Chen, Kang
    Li, Binbin
    Qing, Guangyan
    Liu, Zhongshuai
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2024, 33 (02): : 215 - 229
  • [37] Optimization method of railway route scheme in wind-sand areas based on cloud model and improved TOPSIS
    Gao Y.
    Dong X.
    Cheng J.
    Journal of Railway Science and Engineering, 2023, 20 (02) : 526 - 536
  • [38] Numerical simulation and process optimization for hot stretch bending of Ti-6.5Al-2Zr-1Mo-1V large-section extrusion
    Zhang, Chen
    Li, Dongsheng
    Li, Xiaoqiang
    Xia, Qin
    18TH INTERNATIONAL CONFERENCE ON METAL FORMING 2020, 2020, 50 : 483 - 487
  • [39] Model test study on vibration blasting of large cross-section tunnel with small clearance in horizontal stratified surrounding rock
    Song, Shuguang
    Li, Shucai
    Li, Liping
    Shi, Shaoshuai
    Zhou, Zongqing
    Liu, Zhenhua
    Shang, Chengshun
    Sun, Haozheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 92
  • [40] Optimization design of pre-reinforcement scheme for large cross section shallow buried tunnel in Xi'an Metro
    Gao Xiao-mei
    Dai Jian-bo
    2017 2ND INTERNATIONAL SEMINAR ON ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2017, 231