The ANP-Fuzzy-TOPSIS model for the optimization of the scheme of large-section blasting

被引:0
|
作者
Zhengyu Wu
Qiyue Li
Deguo Kong
Guan Chen
Dayou Luo
机构
[1] Central South University,School of resources and safety engineering
[2] Wuhan University,School of Water Conservancy and Hydropower
来源
关键词
Cut scheme; Evaluation index; Analytic network process (ANP); Fuzzy theory; Technique for order preference by similarity to ideal solution (TOPSIS); Comprehensive evaluation model;
D O I
暂无
中图分类号
学科分类号
摘要
In view of the difficulty of decision-making in the scheme selection of a bauxite mine in extensive section blasting, it is combined with analytic network process (ANP), fuzzy theory, and TOPSIS theory. The establishment of ANP-Fuzzy-TOPSIS comprehensive evaluation index system of comprehensive evaluation model can optimize the 3 selections of blasting scheme. From the 10 indicators of careful consideration of the impact of blasting scheme selection factors of 3 aspects of economy, technology, and safety, through the analytic hierarchy process, it objectively determines the weight vector of each evaluation index. Then, combined with the theory of fuzzy mathematics and the ideal construction of ANP-Fuzzy-TOPSIS comprehensive evaluation model solution method principle, the comprehensive evaluation index of each scheme calculate is calculated based on the superior degree. The selected cutting scheme is superior to 49.8%, 51.3%, and 48.4% to determine the second kinds of blasting scheme (double wedge cut) optimal. The results of this study are consistent with the results of BP neural network method, catastrophe progression method, and AHP-TOPSIS model, which prove the feasibility of the model.
引用
收藏
相关论文
共 50 条
  • [1] The ANP-Fuzzy-TOPSIS model for the optimization of the scheme of large-section blasting
    Wu, Zhengyu
    Li, Qiyue
    Kong, Deguo
    Chen, Guan
    Luo, Dayou
    ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (02)
  • [2] Parameter optimization of smooth blasting on large-section deep-buried tunnel based on factor regression model
    Wang, Jianxiu
    Zou, Baoping
    Zhou, Xiaobo
    Hu, Lisheng
    ROCK CHARACTERISATION, MODELLING AND ENGINEERING DESIGN METHODS, 2013, : 905 - 908
  • [3] 基于ANP-Fuzzy-TOPSIS的企业精益化水平评价研究
    裴小兵
    贾林林
    商业研究, 2017, (01) : 118 - 125
  • [4] OPTIMIZATION OF PRECAUTIONARY MEASURES TO UNSYMMETRICAL PRESSURE OF LARGE-SECTION TUNNEL
    Geng Daxin
    Zhang Weihong
    Yu Denghua
    Zheng Mingxin
    INNOVATION & SUSTAINABILITY OF MODERN RAILWAY PROCEEDINGS OF ISMR' 2008, 2008, : 233 - 239
  • [5] Model Test Study on a Large-section Cable Tunnel
    Chen, Junsheng
    Liu, Shuzhuo
    Gu, Renguo
    Fang, Yingguang
    Mo, Haihong
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1411 - 1416
  • [6] Design and optimization of 420 MPa large-section HSSY columns
    Yu, Xianglin
    Deng, Hongzhou
    Cui, Lei
    Zhang, Donghong
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2017, 129 : 54 - 74
  • [7] Layout method and numerical simulation study of reduced-hole blasting in large-section tunnels
    Liu, Xia
    Tao, Tiejun
    Tian, Xingchao
    Lou, Qianxing
    Xie, Caijin
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [8] Study on the dynamic response characteristics of lining structures in large-section tunnel blasting using JH-2 model analysis
    Li, Fengting
    Wu, Ke
    Li, Shengrui
    Wang, Cao
    Liu, Yajun
    Dou, Zhongyu
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [9] Developing an Integrated ANP and Intuitionistic Fuzzy TOPSIS Model for Supplier Selection
    Rouyendegh, Babak Daneshvar
    JOURNAL OF TESTING AND EVALUATION, 2015, 43 (03) : 664 - 672
  • [10] Design and Optimization of Large-section Profile Die for AZ80 Alloy
    Ma, Minglong
    Wang, Haizhen
    Zhang, Kui
    Yuan, Jiawei
    Li, Ting
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 104 - 108