On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations

被引:0
|
作者
Alexander Schnell
Richard F. Hartl
机构
[1] University of Vienna,Department of Business Administration, Chair of Production and Operations Management
来源
OR Spectrum | 2016年 / 38卷
关键词
Project scheduling; Constraint programming; Multi-mode; Generalized precedence relations; SAT solving;
D O I
暂无
中图分类号
学科分类号
摘要
For variants of the single-mode resource-constrained project scheduling problem, state-of-the-art exact algorithms combine a Branch and Bound algorithm with principles from Constraint Programming and Boolean Satisfiability Solving. In our paper, we propose new exact approaches extending the above principles to the multi-mode RCPSP (MRCPSP) with generalized precedence relations (GPRs). More precisely, we implemented two constraint handlers cumulativemm and gprecedencemm for the optimization framework SCIP. With the latter, one can model renewable resource constraints and GPRs in the context of multi-mode activities, respectively. Moreover, they integrate domain propagation and explanation generation techniques for the above problem characteristics. We formulate three SCIP-models for the MRCPSP with GPRs, two without and one with our constraint handler gprecedencemm. Our computational results on instances from the literature with 30, 50 and 100 activities show that the addition of this constraint handler significantly strengthens the SCIP-model. Moreover, we outperform the state-of-the-art exact approach on instances with 50 activities when imposing time limits of 27 s. In addition, we close (find the optimal solution and prove its optimality for) 289 open instances and improve the best known makespan for 271 instances from the literature.
引用
收藏
页码:283 / 303
页数:20
相关论文
共 50 条
  • [31] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728
  • [32] An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
    DeReyck, B
    Herroelen, W
    COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (01) : 1 - 17
  • [33] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [34] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [35] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [36] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [37] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [38] A generalized network flow model for the multi-mode resource-constrained project scheduling problem with discounted cash flows
    Chen, Miawjane
    Yan, Shangyao
    Wang, Sin-Siang
    Liu, Chiu-Lan
    ENGINEERING OPTIMIZATION, 2015, 47 (02) : 165 - 183
  • [39] A solution framework for the multi-mode resource-constrained cross-dock scheduling problem
    Hermel, Dror
    Hasheminia, Hamed
    Adler, Nicole
    Fry, Michael J.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 59 : 157 - 170
  • [40] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617