Distinguishing Characteristics of Corruption Risks in Iranian Construction Projects: A Weighted Correlation Network Analysis

被引:0
|
作者
M. Reza Hosseini
Igor Martek
Saeed Banihashemi
Albert P. C. Chan
Amos Darko
Mahdi Tahmasebi
机构
[1] Deakin University,School of Architecture and Built Environment
[2] University of Canberra,Faculty of Arts and Design
[3] The Hong Kong Polytechnic University,Department of Building and Real Estate
[4] University Technology Malaysia,Department of Construction Management, Faculty of Civil Engineering
来源
关键词
Corruption; Corrupt practice; Construction projects; Unethical practice; Risk management; Social network analysis;
D O I
暂无
中图分类号
学科分类号
摘要
The construction industry consistently ranks amongst the highest contributors to global gross domestic product, as well as, amongst the most corrupt. Corruption therefore inflicts significant risk on construction activities, and overall economic development. These facts are widely known, but the various sources and nature of corruption risks endemic to the Iranian construction industry, along with the degree to which such risks manifest, and the strength of their impact, remain undescribed. To address the gap, a mixed methods approach is used; with a questionnaire, 103 responses were received, and these were followed up with semi-structured interviews. Results were processed using social network analysis. Four major corruption risks were identified: (1) procedural violations in awarding contracts, (2) misuse of contractual arrangements, (3) neglect of project management principles, and, (4) irrational decision making. While corruption risks in Iran align with those found in other countries, with funds being misappropriated for financial gain, Iran also shows a strong inclination to champion projects that serve the government’s political agenda. Root cause identification of corruption risks, namely, the noticeable impact of authoritarianism on project selection in Iran, over criterion of economic benefit or social good, is a significant outcome of this study.
引用
收藏
页码:205 / 231
页数:26
相关论文
共 50 条
  • [31] Bayesian-network-based safety risk analysis in construction projects
    Zhang, Limao
    Wu, Xianguo
    Skibniewski, Miroslaw J.
    Zhong, Jingbing
    Lu, Yujie
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 131 : 29 - 39
  • [32] Assessment of social sustainability in construction projects using social network analysis
    Almahmoud, Essam
    Doloi, Hemanta
    FACILITIES, 2015, 33 (3-4) : 152 - +
  • [33] Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective
    Ganbat, Tsenguun
    Chong, Heap-yih
    Liao, Pin-Chao
    Leroy, Jeremy
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (12) : 1359 - 1371
  • [34] Risk correlation analysis for China's construction projects based on stakeholder theory
    Deng, Tiejun
    Zhou, Xiangyun
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, 5 (04) : 285 - 292
  • [35] Construction and robustness analysis of urban weighted subway⁃bus composite network
    Pan H.-Y.
    Zhang W.-H.
    Hu B.-Y.
    Liu Z.-Y.
    Wang Y.-G.
    Zhang X.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (11): : 2582 - 2591
  • [36] Corruption dynamics in public procurement: A longitudinal network analysis of local construction contracts in Guatemala
    Waxenecker, Harald
    Prell, Christina
    SOCIAL NETWORKS, 2024, 79 : 154 - 167
  • [37] Weighted Correlation Network Analysis (WGCNA) Applied to the Tomato Fruit Metabolome
    DiLeo, Matthew V.
    Strahan, Gary D.
    den Bakker, Meghan
    Hoekenga, Owen A.
    PLOS ONE, 2011, 6 (10):
  • [38] Analysis of propagation characteristics of APPs based on weighted bipartite network
    Wu, Xiao
    Nie, Xiao
    Liu, Xiao-Hui
    Gao, Shi-Meng
    Qu, Guan-Nan
    Niu, Yan
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2015, 45 (06): : 1946 - 1953
  • [39] Partial event coincidence analysis for distinguishing direct and indirect coupling in functional network construction
    Lu, Jiamin
    Donner, Reik V.
    Yin, Dazhi
    Guan, Shuguang
    Zou, Yong
    CHAOS, 2022, 32 (06)