Predicting construction delay risks in Saudi Arabian projects: A comparative analysis of CatBoost, XGBoost, and LGBM

被引:0
|
作者
Alsulamy, Saleh [1 ]
机构
[1] King Khalid Univ, Architecture & Planning Coll, Dept Architecture, Abha 61421, Saudi Arabia
关键词
Construction delay; Predictive analytics; Machine learning algorithms; CatBoost; XGBoost; LGBM; MODEL;
D O I
10.1016/j.eswa.2024.126268
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Accurately forecasting construction delay risks is essential for effective project management in the construction industry. This study evaluates the performance of three machine learning algorithms CatBoost, XGBoost, and LGBM in predicting construction delays for Saudi Arabian projects with varying levels of Time Overrun (TO). Model efficiency is assessed using key performance metrics, including accuracy, misclassification error, precision, sensitivity, specificity, false positive rate (FPR), and false negative rate (FNR). The results demonstrate that LGBM outperforms CatBoost and XGBoost across all TO categories. For projects with less than 30% TO, LGBM achieves the highest accuracy and sensitivity. In the 30%-60% TO category, it continues to excel, particularly in accuracy and sensitivity. For projects exceeding 60% TO, LGBM maintains its lead with superior accuracy, sensitivity, and specificity. These findings establish LGBM as a highly effective algorithm for predicting construction delays, offering valuable insights for risk assessment and management in the construction sector. While CatBoost and XGBoost also deliver strong performance, showcasing their ability to predict delays across various TO levels, LGBM's consistent superiority highlights its robustness and reliability. This study advances the application of predictive analytics in construction delay risk management, paving the way for the development of effective risk mitigation strategies.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Saudi Arabian aviation construction projects: Identification of risks and their consequences
    Baghdadi, Ahmad
    Kishk, Mohammed
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 32 - 40
  • [2] Using PIPS to minimize causes of delay in Saudi Arabian construction projects: university case study
    Alzara, Majed
    Kashiwagi, Jacob
    Kashiwagi, Dean
    Al-Tassan, Abdulrahman
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 932 - 939
  • [3] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [4] Causes of delays in Saudi Arabian public sector construction projects
    Al-Kharashi, Adel
    Skitmore, Martin
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) : 3 - 23
  • [5] Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects
    Alfalah, Ghasan
    Aldajani, Saad
    Elshaboury, Nehal
    Al-Sakkaf, Abobakr
    Alshamrani, Othman
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024
  • [6] Comparative Analysis of Factors Causing Delay in Residential Construction Projects in Pakistan
    Din, Zia Ud
    Raza, Ali
    Khan, Muhammad Babar
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 640 - 648
  • [7] Applied artificial intelligence for predicting construction projects delay
    Egwim, Christian Nnaemeka
    Alaka, Hafiz
    Toriola-Coker, Luqman Olalekan
    Balogun, Habeeb
    Sunmola, Funlade
    MACHINE LEARNING WITH APPLICATIONS, 2021, 6
  • [8] Risks Analysis and Countermeasures of Construction Projects
    Chu Ying
    Luo Hongyun
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 298 - 300
  • [9] Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
    Gopang, Raja Khan Mohammed
    Imran, Qadir Bux alias
    Nagapan, Sasitharan
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 225 - 233
  • [10] Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia
    Alhajri, Abdullah Rasheed
    Alshibani, Adel
    ENERGIES, 2018, 11 (07):