The first results of testing high-capacity power gas turbine plants

被引:2
|
作者
Ol'Khovskii G.G. [1 ]
机构
[1] OAO All-Russian Thermal Engineering Research Institute, ul. Avtozavodskaya 14
来源
Ol'Khovskii, G.G. | 1600年 / Izdatel'stvo Nauka卷 / 61期
关键词
capacity; combustor; compressor; efficiency; gas turbine unit; turbine;
D O I
10.1134/S0040601514010091
中图分类号
学科分类号
摘要
In combined-cycle units that have been commissioned within recent years at Russian thermal power stations, up-to-date models of high-capacity (from 260 to 290 MW) power gas turbine units (GTUs) were installed. In their schematic diagrams and designs some engineering solutions unusual for domestic practice have been implemented. In the course of tests carried out under operating conditions, there have been obtained high efficiencies of both GTUs themselves (from 36 to 39%) and their turbine machines: compressors and turbines, low design NO x emissions at operating loads, and favorable performance characteristics in a wide range of loads and environmental conditions. © 2014 Pleiades Publishing, Inc.
引用
收藏
页码:4 / 11
页数:7
相关论文
共 50 条
  • [21] Ways to Improve the Efficiency of Operation of Boilers at High-capacity Steam Power plants.
    Dobrokhotov, V.I.
    Teploenergetika, 1981, (07): : 2 - 5
  • [22] GAS-TURBINE POWER-PLANTS OF LARGE UNIT CAPACITY IN STANDARD CONSTRUCTION
    LANGE, KH
    HEINECKE, HJ
    MECHANICAL ENGINEERING, 1977, 99 (07) : 94 - 94
  • [23] High-Capacity Hybrid Active Power Filter for the Power
    Gong, Fen
    Xia, Xiangyang
    Luo, Shiwu
    Zhou, Feng
    PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON INFORMATICS, CYBERNETICS, AND COMPUTER ENGINEERING (ICCE2011), VOL 1: INTELLIGENT CONTROL AND NETWORK COMMUNICATION, 2011, 110 (01): : 95 - +
  • [24] OPTIMIZATION OF CONDENSERS AND COOLING PONDS OF HIGH-CAPACITY STEAM-TURBINE POWER-STATIONS
    BERMAN, LD
    POPYRIN, LS
    RUBINSHTEIN, YM
    ZISMAN, SL
    MINASYAN, RG
    NAUMOV, YV
    CHURPAKOV, AI
    THERMAL ENGINEERING, 1974, 21 (05) : 74 - 79
  • [25] Gas Turbine Power Plants for Emergency Power in Nuclear Power Plants.
    Bjork, Gosta
    Martensson, Kjell
    Daag, Bengt
    1600, (26):
  • [26] STEAM REFORMING FOR HIGH-CAPACITY AMMONIA PLANTS.
    Kratochvil, Jan
    Czechoslovak Heavy Industry, 1975, (10): : 39 - 45
  • [27] Impact of gas turbine frame size on efficiency of gas turbine power plants
    Basha, Mehaboob
    Shaahid, S. M.
    Al-Hadhrami, Luai
    POWER AND ENERGY SYSTEMS III, 2014, 492 : 447 - 452
  • [28] SIMULATION AND INVESTIGATION OF THE COOLING PROCESSES OF HIGH-CAPACITY TURBINE UNITS
    PEREVERZEV, DA
    KOSTRYKIN, VA
    PALEI, VA
    THERMAL ENGINEERING, 1980, 27 (09) : 509 - 512
  • [29] Fuzzy control in gas turbine power plants
    Guo, Xia
    Liu, Shangming
    Wei, Siliang
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2000, 40 (11): : 30 - 34
  • [30] INDUSTRIAL NUCLEAR GAS TURBINE POWER PLANTS
    BAMMERT, K
    BUNDE, R
    ATOMKERNENERGIE, 1968, 13 (05): : 381 - &