Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm

被引:1
|
作者
Yaqin Zhou
Beizhi Li
Jianguo Yang
机构
[1] Donghua University,College of Mechanical Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2006年 / 30卷
关键词
Immune algorithms; Job shop scheduling; Sequence-dependent setup times;
D O I
暂无
中图分类号
学科分类号
摘要
Sequence-dependent setup times are one of the most important factors for the optimization of scheduling the production targets. Usually, they include the changing of tools, fixtures, cutting tools and the cleaning of production equipments. Some of them are relevant not only to the sequence requirement of the products to be processed on the equipment, but also to the processing requirement of the adjoining sequence. In this paper, a job shop scheduling problem with sequence-dependent setup times is described. A mixed integer program model is adopted to deal with this type of problem, and a scheduling algorithm based on biologic immunity mechanism is introduced. The result shows that the antibody encoding method and the mechanism of antibody proliferation and suppression can not only ensure the diversity of the antibody, but can also greatly improve the effectiveness of dealing with complex problems. Finally, a scheduling problem of finishing processing for a woollen mill is analyzed with its result described.
引用
收藏
页码:105 / 111
页数:6
相关论文
共 50 条
  • [31] A genetic algorithm for the batch scheduling with sequence-dependent setup times
    Chen, TsiuShuang
    Long, Lei
    Fung, Richard Y. K.
    INTELLIGENT COMPUTING IN SIGNAL PROCESSING AND PATTERN RECOGNITION, 2006, 345 : 1137 - 1144
  • [32] An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    Husseini, S. M. Moattar
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 111 - 127
  • [33] Job-shop scheduling problem with sequence dependent setup times
    Moghaddas, R.
    Houshmand, M.
    IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1546 - 1552
  • [34] Job shop scheduling with sequence dependent setup times to minimize makespan
    Sun, JU
    Yee, SR
    Hwang, H
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (04): : 455 - 461
  • [35] An imperialist competitive algorithm with feedback for energy-efficient flexible job shop scheduling with transportation and sequence-dependent setup times
    Li, Ming
    Lei, Deming
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 103
  • [36] An MBO Algorithm for a Flow Shop Problem with Sequence-Dependent Setup Times
    Sioud, Aymen
    Gagne, Caroline
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 2471 - 2474
  • [37] RESCHEDULING OF FLEXIBLE FLOW SHOP WITH SEQUENCE-DEPENDENT SETUP TIMES AND JOB SPLITTING
    Kim, Jun
    Lee, Je-Hun
    Choi, Seong-Lak
    Jung, Hyun-Jin
    Kim, Yun-Bac
    Kim, Hyun-Jung
    Kim, Byung-Hee
    Chung, Gu-Hwan
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3745 - 3755
  • [38] IMPACT OF SEQUENCE-DEPENDENT SETUP TIME ON JOB-SHOP SCHEDULING PERFORMANCE
    KIM, SC
    BOBROWSKI, PM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (07) : 1503 - 1520
  • [39] A flexible job shop cell scheduling with sequence-dependent family setup times and intercellular transportation times using conic scalarization method
    Deliktas, Derya
    Torkul, Orhan
    Ustun, Ozden
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (06) : 2410 - 2431
  • [40] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    Mathematical Problems in Engineering, 2022, 2022