共 50 条
- [22] A new exact solution algorithm for the job shop problem with sequence-dependent setup times INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2004, 3011 : 37 - 49
- [23] Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis International Journal of Advanced Manufacturing Technology, 2008, 36 (3-4): : 355 - 372
- [24] Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (3-4): : 355 - 372
- [27] Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis The International Journal of Advanced Manufacturing Technology, 2008, 36 : 355 - 372
- [28] A Fuzzy-Genetic Algorithm for a Re-entrant Job Shop Scheduling Problem with Sequence-Dependent Setup Times 2013 13TH IRANIAN CONFERENCE ON FUZZY SYSTEMS (IFSC), 2013,
- [30] A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times Journal of Intelligent Manufacturing, 2011, 22 : 965 - 978