Solving project scheduling problem with the philosophy of fuzzy random programming

被引:0
|
作者
Hua Ke
Weimin Ma
Junjie Ma
机构
[1] Tongji University,School of Economics and Management
[2] Tongji University,School of Law
来源
关键词
Project scheduling; Fuzzy random programming; Fuzzy random simulation; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Project scheduling problem is to determine the schedule of allocating resources to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. Due to the complex external environment, this paper considers project scheduling problem with coexisted uncertainty of randomness and fuzziness, in which the philosophy of fuzzy random programming is introduced. Based on different ranking criteria of fuzzy random variables, three types of fuzzy random models are built. Besides, a searching approach by integrating fuzzy random simulations and genetic algorithm is designed for searching the optimal schedules. The goal of the paper is to provide a new method for solving project scheduling problem in hybrid uncertain environments.
引用
收藏
页码:269 / 284
页数:15
相关论文
共 50 条
  • [41] Interactive programming approach for solving the fully fuzzy bilevel linear programming problem
    Ren, Aihong
    Wang, Yuping
    Xue, Xingsi
    KNOWLEDGE-BASED SYSTEMS, 2016, 99 : 103 - 111
  • [42] SOLVING FUZZY LINEAR PROGRAMMING PROBLEM USING A FUZZY LOGARITHMIC BARRIER METHOD
    Gani, A. Nagoor
    Yogarani, R.
    ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2021, 20 (04): : 583 - 595
  • [43] Solving fuzzy two-stage programming problem with discrete fuzzy vector
    Wang, Sheng-Hua
    Guo, Bao-Hua
    Zhang, Qun-Feng
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 1288 - +
  • [44] Solving the resource constrained project scheduling problem with quantum annealing
    Armas, Luis Fernando Perez
    Creemers, Stefan
    Deleplanque, Samuel
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [45] Genetic Algorithm for Solving the Resource Constrained Project Scheduling Problem
    Alaa, Touihri
    Saoussen, Krichen
    Adel, Guitouni
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2015, 6 (02) : 45 - 60
  • [46] Solving the Software Project Scheduling Problem with Hyper-heuristics
    de Andrade, Joaquim
    Silva, Leila
    Britto, Andre
    Amaral, Rodrigo
    ARTIFICIAL INTELLIGENCEAND SOFT COMPUTING, PT I, 2019, 11508 : 399 - 411
  • [47] Hybrid approach for solving resourceconstrained software project scheduling problem
    Gul, Nurhan
    Arici, Nursal
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [48] New Method for Solving Full Fuzzy Quadratic Programming Problem
    Ding, Xianfeng
    Li, Jiaxin
    Wei, Tingting
    Wang, Yiyuan
    IAENG International Journal of Computer Science, 2023, 50 (02)
  • [49] Solving Fuzzy Linear Programming Problem Using Defuzzification Method
    Veerraju, Nalla
    Prasannam, V. Lakshmi
    COMMUNICATIONS IN MATHEMATICS AND APPLICATIONS, 2021, 12 (02): : 335 - 345
  • [50] Solving intuitionistic fuzzy transportation problem using linear programming
    Kour D.
    Mukherjee S.
    Basu K.
    International Journal of System Assurance Engineering and Management, 2017, 8 (Suppl 2) : 1090 - 1101