Solving project scheduling problem with the philosophy of fuzzy random programming

被引:0
|
作者
Hua Ke
Weimin Ma
Junjie Ma
机构
[1] Tongji University,School of Economics and Management
[2] Tongji University,School of Law
来源
关键词
Project scheduling; Fuzzy random programming; Fuzzy random simulation; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Project scheduling problem is to determine the schedule of allocating resources to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. Due to the complex external environment, this paper considers project scheduling problem with coexisted uncertainty of randomness and fuzziness, in which the philosophy of fuzzy random programming is introduced. Based on different ranking criteria of fuzzy random variables, three types of fuzzy random models are built. Besides, a searching approach by integrating fuzzy random simulations and genetic algorithm is designed for searching the optimal schedules. The goal of the paper is to provide a new method for solving project scheduling problem in hybrid uncertain environments.
引用
收藏
页码:269 / 284
页数:15
相关论文
共 50 条
  • [21] A goal programming approach for solving the random interval linear programming problem
    Arjmandzadeh, Ziba
    Safi, Mohammadreza
    TURKISH JOURNAL OF MATHEMATICS, 2017, 41 (04) : 775 - 786
  • [22] Solving a Fully Fuzzy Linear Programming Problem through Compromise Programming
    Cheng, Haifang
    Huang, Weilai
    Cai, Jianhu
    JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [23] Solving the project scheduling problem with dependent resource constraints
    Lin, Chun-Wei R.
    Lai, Yung Sheng
    Jeng, Shiou-Yun
    Hsiau, Hsian-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2025, 42 (01) : 30 - 46
  • [24] A Bilevel Model for Project Scheduling in a Fuzzy Random Environment
    Xu, Jiuping
    Ma, Yanfang
    Xu, Zeshui
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (10): : 1322 - 1335
  • [25] An insertion mutation operator for solving project scheduling problem
    Nazeri, Zeinab
    Khanli, Leyli Mohammad
    2014 IRANIAN CONFERENCE ON INTELLIGENT SYSTEMS (ICIS), 2014,
  • [26] Solving an Integrated Project Portfolio Selection and Contractor Selection Problem: Fuzzy Goal Programming Based on Fuzzy Preference Relations
    Zahedirad, Mostafa
    Khalili-Damghani, Kaveh
    Ghezavati, Vahidreza
    Komijan, Alireza Rashidi
    FUZZY INFORMATION AND ENGINEERING, 2025, 17 (01) : 75 - 107
  • [27] A New Uncertain Programming Model for Project Scheduling Problem
    Zhang, Xingfang
    Chen, Xiaowei
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (10): : 3901 - 3910
  • [28] Solving the General Fuzzy Random Bilevel Programming Problem Through Me Measure-Based Approach
    Ren, Aihong
    IEEE ACCESS, 2018, 6 : 25610 - 25620
  • [29] Solving geometric programming problems with fuzzy random variable coefficients
    Chakraborty, Debjani
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (06) : 2493 - 2499
  • [30] A GA-based approach for solving fuzzy project scheduling
    Liu, Yan
    Zhao, Sheng-Li
    Zhang, Xi-Ping
    Du, Guang-Qian
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3153 - +