Implementing earned value management using bridge information modeling

被引:0
|
作者
Mohamed Marzouk
Mohamed Hisham
机构
[1] Cairo University,Structural Engineering Department
[2] Nile University,Construction Engineering and Management Program
来源
关键词
building information modeling; infrastructure bridges; bridge information modeling; cost estimate; time and cost control;
D O I
暂无
中图分类号
学科分类号
摘要
Building Information Modeling (BIM) has widely become an effective tool in engineering and construction fields. It could be used in: generating shop drawings; detecting clashes; estimating quantities; and controlling documents. Applying BIM technology on bridges is named Bridge Information Modeling (BrIM). Bridge Information Modeling (BrIM) is an intelligent representation of bridges since it contains all information needed about bridges through their whole lifecycle. This paper presents the use of Building Information Modeling in cost and time management of infrastructure bridges. BIM-based cost estimation application is presented which is capable to carry out approximate cost estimate; and detailed cost estimate. The application is designed in a flexible manner to be used with default values, or user defined values. Different performance measurement indexes are used in order to control the cost and schedule during execution phase of construction projects. This application integrates BIM with Earned Value (EV) concept to determine the project status at specific reporting date. A case study is presented to demonstrate the use of the developed modules.
引用
收藏
页码:1302 / 1313
页数:11
相关论文
共 50 条
  • [1] Implementing earned value management using bridge information modeling
    Marzouk, Mohamed
    Hisham, Mohamed
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (05) : 1302 - 1313
  • [2] INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT
    Bagherpour, Morteza
    Khaje Zadeh, Mohammad
    Mahmoudi, Amin
    Deng, Xiaopeng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (06) : 524 - 533
  • [3] Earned value management insights using inferential statistics
    Marshall, Robert A.
    Ruiz, Philippe
    Bredillet, Christophe N.
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (02) : 288 - 294
  • [4] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [5] Earned schedule: An emerging enhancement to earned value management
    Lipke, Walt
    Henderson, Kym
    CrossTalk, 2006, 19 (11): : 26 - 30
  • [6] Extensions of earned value management: Using the earned incentive metric to improve signal quality
    Kerkhove, L. -P.
    Vanhoucke, M.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) : 148 - 168
  • [7] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [8] Modernizing earned value management
    Abba, Wayne F. (abbaconsulting@cox.net), 1600, U.S. Department of Defense (30):
  • [9] Assessing the performance of construction projects: Implementing earned value management at the General Services Administration
    Alvarado, Carlos
    Silverman, Robert
    Wilson, David
    JOURNAL OF FACILITIES MANAGEMENT, 2005, 3 (01) : 92 - +
  • [10] Building Information Modeling 5D and Earned Value Management methodologies integration through a computational tool
    Cardenas, C.
    Zapata, P.
    Lozano, N.
    REVISTA INGENIERIA DE CONSTRUCCION, 2018, 33 (03): : 263 - 278