The reliability/cost trade-off for a class of ODE solvers

被引:0
|
作者
W. H. Enright
Li Yan
机构
[1] University of Toronto,Department of Computer Science
来源
Numerical Algorithms | 2010年 / 53卷
关键词
Runge-Kutta methods; Initial value problems; Defect; Error control; Continuous methods; 65L05; 65L10;
D O I
暂无
中图分类号
学科分类号
摘要
In the numerical solution of ODEs, it is now possible to develop efficient techniques that will deliver approximate solutions that are piecewise polynomials. The resulting methods can be designed so that the piecewise polynomial will satisfy a perturbed ODE with an associated defect (or residual) that is directly controlled in a consistent fashion. We will investigate the reliability/cost trade off that one faces when implementing and using such methods, when the methods are based on an underlying discrete Runge-Kutta formula. In particular we will identify a new class of continuous Runge-Kutta methods with a very reliable defect estimator and a validity check that reflects the credibility of the estimate. We will introduce different measures of the “reliability” of an approximate solution that are based on the accuracy of the approximate solution; the maximum magnitude of the defect of the approximate solution; and how well the method is able to estimate the maximum magnitude of the defect of the approximate solution. We will also consider how methods can be implemented to detect and cope with special difficulties such as the effect of round-off error (on a single step) or the ability of a method to estimate the magnitude of the defect when the stepsize is large (as might happen when using a high-order method at relaxed accuracy requests). Numerical results on a wide selection of problems will be summarized for methods of orders five, six and eight. It will be shown that a modest increase in the cost per step can lead to a significant improvement in the quality of the approximate solutions and the reliability of the method. For example, the numerical results demonstrate that, if one is willing to increase the cost per step by 50%, then a method can deliver approximate solutions where the reported estimated maximum defect is within 1% of its true value on 95% of the steps.
引用
收藏
页码:239 / 260
页数:21
相关论文
共 50 条
  • [41] On the Trade-off Between Communication Reliability and Latency in the Absence of Feedback
    Zhu, Zhicheng
    Xu, Xiaoli
    Zeng, Yong
    Huang, Xinmei
    2024 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE, WCNC 2024, 2024,
  • [42] Trade-off risks: Addressing the tension between reliability and safety
    Montague, DF
    Rooney, JJ
    INTERNATIONAL CONFERENCE AND WORKSHOP ON RELIABILITY AND RISK MANAGEMENT, 1998, : 235 - 251
  • [43] Reliability/energy trade-off in Bluetooth error control schemes
    Khodadoustan, Safieh
    Jalali, Fatemeh
    Ejlali, Alireza
    MICROELECTRONICS RELIABILITY, 2011, 51 (08) : 1398 - 1412
  • [44] Free trade trade-off
    Freedman, M
    FORBES, 2002, 169 (06): : 44 - 44
  • [45] Speculative Instruction Validation for Performance-Reliability Trade-off
    Kumar, Sumeet
    Aggarwal, Aneesh
    2008 IEEE 14TH INTERNATIONAL SYMPOSIUM ON HIGH PEFORMANCE COMPUTER ARCHITECTURE, 2008, : 375 - 384
  • [46] Hybrid time-quality-cost trade-off problems
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 306 - 318
  • [47] On Dependability, Cost and Security Trade-off in Cloud Data Centers
    Mondal, Subrota K.
    Sabyasachi, Abadhan S.
    Muppala, Jogesh K.
    2017 IEEE 22ND PACIFIC RIM INTERNATIONAL SYMPOSIUM ON DEPENDABLE COMPUTING (PRDC 2017), 2017, : 11 - 19
  • [48] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [49] TRADE-OFF OF GRADATION AND COST REQUIREMENTS IN AGGREGATE BLENDING.
    Easa, Said M.
    Cement, Concrete and Aggregates, 1985, 7 (01): : 29 - 36
  • [50] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619