The reliability/cost trade-off for a class of ODE solvers

被引:0
|
作者
W. H. Enright
Li Yan
机构
[1] University of Toronto,Department of Computer Science
来源
Numerical Algorithms | 2010年 / 53卷
关键词
Runge-Kutta methods; Initial value problems; Defect; Error control; Continuous methods; 65L05; 65L10;
D O I
暂无
中图分类号
学科分类号
摘要
In the numerical solution of ODEs, it is now possible to develop efficient techniques that will deliver approximate solutions that are piecewise polynomials. The resulting methods can be designed so that the piecewise polynomial will satisfy a perturbed ODE with an associated defect (or residual) that is directly controlled in a consistent fashion. We will investigate the reliability/cost trade off that one faces when implementing and using such methods, when the methods are based on an underlying discrete Runge-Kutta formula. In particular we will identify a new class of continuous Runge-Kutta methods with a very reliable defect estimator and a validity check that reflects the credibility of the estimate. We will introduce different measures of the “reliability” of an approximate solution that are based on the accuracy of the approximate solution; the maximum magnitude of the defect of the approximate solution; and how well the method is able to estimate the maximum magnitude of the defect of the approximate solution. We will also consider how methods can be implemented to detect and cope with special difficulties such as the effect of round-off error (on a single step) or the ability of a method to estimate the magnitude of the defect when the stepsize is large (as might happen when using a high-order method at relaxed accuracy requests). Numerical results on a wide selection of problems will be summarized for methods of orders five, six and eight. It will be shown that a modest increase in the cost per step can lead to a significant improvement in the quality of the approximate solutions and the reliability of the method. For example, the numerical results demonstrate that, if one is willing to increase the cost per step by 50%, then a method can deliver approximate solutions where the reported estimated maximum defect is within 1% of its true value on 95% of the steps.
引用
收藏
页码:239 / 260
页数:21
相关论文
共 50 条
  • [31] On the Trade-off between Cost and Availability of Virtual Networks
    Herker, Sandra
    Kiess, Wolfgang
    An, Xueli
    Kirstaedter, Andreas
    2014 IFIP NETWORKING CONFERENCE, 2014,
  • [32] COLLECTOR COST AND PERFORMANCE TRADE-OFF STUDIES.
    Eason, Ernest D.
    1978, : 59 - 79
  • [33] TRADE-OFF
    MANKIW, NG
    NEW REPUBLIC, 1991, 204 (13) : 4 - 4
  • [34] Trade-Off Between Speed and Cost in Shortcuts to Adiabaticity
    Campbell, Steve
    Deffner, Sebastian
    PHYSICAL REVIEW LETTERS, 2017, 118 (10)
  • [35] Trade-off between requirement of learning and computational cost
    Hong, TP
    Wang, CH
    Tseng, SS
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 1998, E81D (06) : 565 - 571
  • [36] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [37] COST RELIABILITY TRADE OFF IN AN ELECTRONIC MODULE
    SURENDRAN, K
    CHANDRA, KR
    MICROELECTRONICS AND RELIABILITY, 1976, 15 (05): : 493 - 496
  • [38] Uncertainty trade-off and disturbance trade-off for quantum measurements
    Srinivas, M. D.
    Mandayam, Prabha
    CURRENT SCIENCE, 2015, 109 (11): : 2044 - 2051
  • [39] Energy management of islanded microgrid for reliability and cost trade-off with PV, energy storage, and diesel generator
    Thirugnanam, Kannan
    Kerk, See Gim
    Tushar, Wayes
    Yuen, Chau
    IET SMART GRID, 2020, 3 (06) : 870 - 881
  • [40] Analysis of Reliability/Performance Trade-off in Solid State Drives
    Zuolo, Lorenzo
    Zambelli, Cristian
    Micheloni, Rino
    Bertozzi, Davide
    Olivo, Piero
    2014 IEEE INTERNATIONAL RELIABILITY PHYSICS SYMPOSIUM, 2014,