Process-circuit and layout solutions for steam-turbine units and performance efficiency of thermal power plants

被引:1
|
作者
Gol’dberg A.A. [1 ]
Shibaev T.L. [1 ]
机构
[1] Ural Turbine Works, ul. Frontovykh Brigad 18, Yekaterinburg
来源
Gol’dberg, A.A. (skbt@utz.ru) | 1600年 / Izdatel'stvo Nauka卷 / 61期
关键词
Costs; Efficiency; Process-circuit and layout solutions; Steam-turbine units; Thermal power plants;
D O I
10.1134/S0040601514120027
中图分类号
学科分类号
摘要
Criteria for evaluating process-circuit and layout solutions adopted in designing steam-turbine units are presented together with their values for a number of steam-turbine units produced by the Ural Turbine Works. The presented values of the criteria are recommended for being used as tentative ones in designing new thermal power plants or in upgrading them with the use of steam turbine units operating both as basic power installations and as part of combined-cycle power plants. The influence of process-circuit and layout solutions adopted for steam-turbine units on the effectiveness of thermal power plant construction and plant performance efficiency is shown. © 2014, Pleiades Publishing, Inc.
引用
收藏
页码:873 / 879
页数:6
相关论文
共 50 条