Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms

被引:0
|
作者
Erfan Babaee Tirkolaee
Alireza Goli
Milad Hematian
Arun Kumar Sangaiah
Tao Han
机构
[1] Mazandaran University of Science and Technology,Department of Industrial Engineering
[2] Islamic Azad University,Young Researchers and Elite Club, Ayatollah Amoli Branch
[3] Yazd University,Department of Industrial Engineering
[4] Vellore Institute of Technology,School of Computing Science and Engineering
[5] Dongguan University of Technology,DGUT
来源
Computing | 2019年 / 101卷
关键词
Multi-mode resource-constrained project scheduling problem; NPV; Payment planning; ε-Constraint method; NSGA-II; MOSA; 90Cxx; 90-08; 68Txx; 90B35; 90B50;
D O I
暂无
中图分类号
学科分类号
摘要
This study addresses the multi-objective multi-mode resource-constrained project scheduling problem with payment planning where the activities can be done through one of the possible modes and the objectives are to maximize the net present value and minimize the completion time concurrently. Moreover, renewable resources including manpower, machinery, and equipment as well as non-renewable ones such as consumable resources and budget are considered to make the model closer to the real-world. To this end, a non-linear programming model is proposed to formulate the problem based on the suggested assumptions. To validate the model, several random instances are designed and solved by GAMS-BARON solver applying the ε-constraint method. For the high NP-hardness of the problem, we develop two metaheuristics of non-dominated sorting genetic algorithm II and multi-objective simulated annealing algorithm to solve the problem. Finally, the performances of the proposed solution techniques are evaluated using some well-known efficient criteria.
引用
收藏
页码:547 / 570
页数:23
相关论文
共 50 条
  • [31] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    [J]. JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728
  • [32] A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
    Liu Changchun
    Xiang Xi
    Zhang Canrong
    Wang Qiang
    Zheng Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 258 - 278
  • [33] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    [J]. SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [34] A Multi-Objective Project Scheduling Problem Subject to Project Reliability and Multi-Mode Activities with Time Window
    Nejad, Behnam Hosseinian
    Farughi, Hiwa
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2021, 20 (03): : 356 - 372
  • [35] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    [J]. 19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [36] Multi-mode resource constrained project scheduling under resource disruptions
    Chakrabortty, Ripon K.
    Sarker, Ruhul A.
    Essam, Daryl L.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 88 : 13 - 29
  • [37] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Alessandro Hill
    Eduardo Lalla-Ruiz
    Stefan Voß
    Marcos Goycoolea
    [J]. Journal of Scheduling, 2019, 22 : 173 - 182
  • [38] A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem
    Hill, Alessandro
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    Goycoolea, Marcos
    [J]. JOURNAL OF SCHEDULING, 2019, 22 (02) : 173 - 182
  • [39] Multi-objective resource constrained project scheduling problem based on improved ant colony optimization
    An X.
    Zhang Z.
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (02): : 509 - 519
  • [40] A hybrid Pareto-based local search for multi-objective flexible job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    [J]. 2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,