Regional seismic risk assessment method for electric power substations: a case study

被引:0
|
作者
Zekavati A.A. [1 ]
Jafari M.A. [1 ]
Mahmoudi A. [1 ,2 ]
机构
[1] Power Industry Structures Research Department, Niroo Research Institute (NRI), P. O. Box 14665-517, Tehran
[2] Department of Civil Engineering, K. N. Toosi University of Technology, Tehran
关键词
Electric power substations; Fragility curves; Loss curves; Regional seismic risk; Reliability analysis; Scenario sampling;
D O I
10.1007/s41872-021-00178-9
中图分类号
学科分类号
摘要
In this paper, the application of risk analysis based on reliability methods to estimate the expected annual loss (repair cost) from seismic events, to substations located in the widespread area has been investigated. The proposed method is based on the PEER general framework for seismic risk assessment and using scenario sampling that generates the random annual samples of seismic events and their consequences. Probabilistic models were developed to simulate seismic hazard (including earthquake occurrence, magnitude, location and intensity), seismic response and damage of substations using fragility models and economic loss (repair cost). In seismic hazard modeling; occurrence, magnitude, depth and location of earthquake events was randomly simulated using the polynomial area source model. The intensity (PGA) of the earthquake was then calculated at the location of each substation. By collecting the existing data records from past earthquakes, the probabilistic model for the repair cost of substations was developed as a ratio of construction cost. The regional seismic risk assessment using the proposed method is implemented in an area, which includes 92 substations at the voltage levels of 63, 230, and 400 kV. The annual loss curves for substations in the case study area in both anchored and unanchored states have been estimated. The results show that the anchorage of equipment at the power substations in the study area, led to a 25% reduction in the expected annual loss. Using the difference between the average annual loss in the anchored and unanchored states of power substations, the cost of rational retrofitting of substations in the study area can be estimated. © 2021, The Author(s), under exclusive licence to Society for Reliability and Safety (SRESA).
引用
收藏
页码:105 / 115
页数:10
相关论文
共 50 条
  • [31] Assessment of Transmission Substations for AMI Upgrade (KSA Case Study)
    Mohandes, Mohamed
    Shinde, Dattatray
    Mashhour, Ali M.
    Al-Hsaien, Shafi
    Al-Resheed, Suliman
    2016 INTERNATIONAL CONFERENCE ON AUTOMATIC CONTROL AND DYNAMIC OPTIMIZATION TECHNIQUES (ICACDOT), 2016, : 233 - 238
  • [32] Probe into the method of regional ecological risk assessment - a case study of wetland in the Yellow River Delta in China
    Xu, XG
    Lin, HP
    Fu, ZY
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2004, 70 (03) : 253 - 262
  • [33] Lightning Risk Assessment on Outdoor HV Substations Based on IEC 62305-2: A Case Study
    Shen, Ong Chang
    Lim, Siow Chun
    Eng, Ngu Eng
    19TH IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT (SCORED 2021), 2021, : 218 - 223
  • [34] Quantitative assessment of the seismic net-pay method: A case study
    Meza, Ramses G.
    Florez, Juan M.
    Kuzmin, Stanislav
    Castagna, John P.
    Interpretation-A Journal of Subsurface Characterization, 2015, 3 (02): : B25 - B36
  • [35] A model for the seismic reliability assessment of electric power transmission systems
    Ang, AHS
    Pires, JA
    Villaverde, R
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 51 (01) : 7 - 22
  • [36] A regional approach to the environmental risk assessment - Human health risk assessment case study in the Campania region
    Minolfi, Giulia
    Albanese, Stefano
    Lima, Annamaria
    Tarvainen, Timo
    Fortelli, Alberto
    De Vivo, Benedetto
    JOURNAL OF GEOCHEMICAL EXPLORATION, 2018, 184 : 400 - 416
  • [37] Risk assessment:method and case study for traffic projects
    Xin Yu
    Panos D.Prevedouros
    Journal of Modern Transportation, 2017, (04) : 236 - 249
  • [38] Risk assessment: method and case study for traffic projects
    Yu X.
    Prevedouros P.D.
    Journal of Modern Transportation, 2017, 25 (4): : 236 - 249
  • [39] Probabilistic decision support for regional seismic risk assessment and mitigation
    Park, J
    Dueñas-Osorio, L
    Goodno, B
    Craig, J
    Bostrom, A
    APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, VOLS 1 AND 2, 2003, : 837 - 842
  • [40] Regional seismic risk assessment based on ground conditions in Uzbekistan
    Ismailov, Vakhitkhan Alikhanovich
    Yodgorov, Sharofiddin Ismatullayevich
    Khusomiddinov, Akhror Sabriddinovich
    Yadigarov, Eldor Makhmadiyorovich
    Aktamov, Bekzod Uktamovich
    Avazov, Shuhrat Bakhtiyorovich
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2024, 24 (06) : 2133 - 2146