摘要
Mining modifies the environment and produces socioenvironmental risks, clearly seen from the occurrence of disasters that marked the trajectory of mineral exploration in Brazil. The objective of this paper is to analyze, from the perspective of the principles of prevention and the polluter pays, the effectiveness of the norms that prohibited the use of the so-called upstream dam method and determined the decommissioning of tailings dams, in addition to those that determine mine closure and repair of the area degraded by mining. The research was based on primary and secondary data consisting of analysis of legislative texts and doctrine. It was possible to conclude that the public power should encourage the implementation of the internalisation of negative externalities by mining enterprises, requiring the adoption of preventive measures.
引用
收藏
页码:63 / 85
页数:23
相关论文
共 50 条
  • [21] MINING ENVIRONMENT - FINANCIAL ASSURANCES FOR MINE CLOSURE - A DISCUSSION OF THE ISSUES
    MARCUS, J
    E&MJ-ENGINEERING AND MINING JOURNAL, 1990, 191 (08): : E16 - &
  • [22] Are mining companies mature for mine closure? An approach for evaluating preparedness
    Galo, David de Barros
    dos Anjos, José Ângelo Sebastião Araújo
    Sánchez, Luis Enrique
    Resources Policy, 2022, 78
  • [23] Managing the risk during mine closure and beyond
    Currey, N
    MINING RISK MANAGEMENT CONFERENCE 2003, PROCEEDINGS: EFFECTIVE RISK MANAGEMENT FOR MINING PROJECT OPTIMISATION, 2003, : 359 - 363
  • [24] Classification of risk factors associated with mine closure
    Laurence, D
    MINERAL RESOURCES ENGINEERING, 2001, 10 (03): : 315 - 331
  • [25] Application of inspection and monitoring in the reduction of risk for mine tailings dams
    Cambridge, Mike
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2022, 175 (02) : 142 - 150
  • [26] Analysis of the mine closure plan in the economic exploitation plan for an ore body - an NRM-20 requirement
    Resende, Alessandro Gomes
    de Lima, Hernani Mota
    do Carmo Flores, Jose Cruz
    REM-REVISTA ESCOLA DE MINAS, 2010, 63 (04) : 685 - 690
  • [27] Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine
    Zhu, Ming
    Sun, Jinlong
    Liu, Wensheng
    Zhang, Aixia
    Zhou, Huizhi
    Ai, Lixin
    Peng, Jihuan
    Jia, Yunxi
    Wang, Lei
    MANUFACTURING SYSTEMS ENGINEERING, 2012, 429 : 206 - +
  • [28] The Visual Management System for the mining and excavating plan of coal mine on GIS
    Cunen, Xing
    Shenhu, Wang
    Yongfeng, Cui
    Zhihe, Liu
    Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 1984 - 1988
  • [29] Evaluation of the impact of commodity price change on mine plan of underground mining
    Salama Abubakary
    Nehring Micah
    Greberg Jenny
    International Journal of Mining Science and Technology, 2015, 25 (03) : 375 - 382
  • [30] Evaluation of the impact of commodity price change on mine plan of underground mining
    Abubakary, Salama
    Micah, Nehring
    Jenny, Greberg
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2015, 25 (03) : 375 - 382