Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine

被引:1
|
作者
Zhu, Ming [1 ]
Sun, Jinlong [1 ]
Liu, Wensheng [1 ]
Zhang, Aixia [1 ]
Zhou, Huizhi [2 ]
Ai, Lixin [2 ]
Peng, Jihuan [2 ]
Jia, Yunxi [2 ]
Wang, Lei [2 ]
机构
[1] Hebei Polytech Univ, Min & Safety Technol Key Lab Hebei Prov, Coll Resource & Environm, Tangshan 063009, Peoples R China
[2] Hebei Iron & Steel Grp Mining Co Ltd, Tangsha 063020, Peoples R China
来源
MANUFACTURING SYSTEMS ENGINEERING | 2012年 / 429卷
关键词
Mining production plan; linear programming; synthesis optimization; quality equilibrium; transition from open pit to underground;
D O I
10.4028/www.scientific.net/AMR.429.206
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Faced with the difficult situation of the joint operation of open pit and underground mining in transition period in Shirengou Iron Mine, a suitable linear programming mathematical model of mining plan was established and synthesis optimization results were obtained, which would increase the overall economic effect of the mining operation during the transition period, while the limited reserves and ore quality control were entirely considered. A pronounced economic benefit was achieved by the project optimization. This mathematical model can be widely used in mining process to control the quality and quantity equilibrium of ore output, comprehensive utilize some waste rock and optimize the mining plan.
引用
收藏
页码:206 / +
页数:2
相关论文
共 50 条
  • [1] Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine
    Zhu, Ming
    Sun, Jinlong
    Liu, Wensheng
    Zhang, Aixia
    Zhou, Huizhi
    Ai, Lixin
    Peng, Jihuan
    Jia, Yunxi
    Wang, Lei
    2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL II, 2010, : 467 - 469
  • [2] Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine
    Zhu, Ming
    Sun, Jinlong
    Liu, Wensheng
    Zhang, Aixia
    Zhou, Huizhi
    Ai, Lixin
    Peng, Jihuan
    Jia, Yunxi
    Wang, Lei
    2011 INTERNATIONAL CONFERENCE ON FUTURE INFORMATION ENGINEERING (ICFIE 2011), 2011, 8 : 194 - 198
  • [3] Study on stability of underground rock mass in Shirengou iron mine based on microseismic monitoring
    Zheng Chao
    Yang Tianhong
    Yu Qinglei
    Zhang Penghai
    Xia Dong
    Liu Honglei
    Li Haizhou
    DISASTER ADVANCES, 2012, 5 (04): : 822 - 826
  • [4] Optimization of Production Plan Based on Linear Multi-objective Programming
    Zhang, Jianwei
    Xiang, Zhongfan
    2016 3RD INTERNATIONAL CONFERENCE ON MECHANICAL, INDUSTRIAL, AND MANUFACTURING ENGINEERING (MIME 2016), 2016, : 82 - 84
  • [5] TREATMENT PLAN OPTIMIZATION USING LINEAR-PROGRAMMING
    ROSEN, II
    LANE, RG
    MORRILL, SM
    BELLI, JA
    MEDICAL PHYSICS, 1991, 18 (02) : 141 - 152
  • [6] Linear Programming Solving the Optimization Question of Production Plan
    Wu, Juan
    MATERIALS SCIENCE AND ENGINEERING, PTS 1-2, 2011, 179-180 : 1162 - 1166
  • [7] NUMERICAL ANALYSIS OF STABILITY OF ROCK MASS IN SHIRENGOU IRON MINE, TANGSHAN CITY, FROM OPEN-PIT TO UNDERGROUND MINING
    Ma, Tian-Hui
    Tang, Chun-An
    Li, Lian-Chong
    Zhang, Yong-Bin
    CONTROLLING SEISMIC HAZARD AND SUSTAINABLE DEVELOPMENT OF DEEP MINES: 7TH INTERNATIONAL SYMPOSIUM ON ROCKBURST AND SEISMICITY IN MINES (RASIM7), VOL 1 AND 2, 2009, : 1247 - 1250
  • [8] Production scheduling in an opencast iron ore mine - a linear programming approach
    Singh, A.K.
    Bhatnagar, K.K.
    Journal of Mines, Metals and Fuels, 1987, 35 (11): : 463 - 465
  • [9] Mining Plan Optimization of Multi-Metal Underground Mine Based on Adaptive Hybrid Mutation PSO Algorithm
    Zhao, Yifei
    Chen, Jianhong
    Yang, Shan
    Chen, Yi
    MATHEMATICS, 2022, 10 (14)
  • [10] A nonlinear goal-programming-based DE and ANN approach to grade optimization in iron mining
    He, Yong
    Gao, Siwei
    Liao, Nuo
    Liu, Hongwei
    NEURAL COMPUTING & APPLICATIONS, 2016, 27 (07): : 2065 - 2081