共 50 条
- [1] Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine 2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL II, 2010, : 467 - 469
- [2] Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine 2011 INTERNATIONAL CONFERENCE ON FUTURE INFORMATION ENGINEERING (ICFIE 2011), 2011, 8 : 194 - 198
- [3] Study on stability of underground rock mass in Shirengou iron mine based on microseismic monitoring DISASTER ADVANCES, 2012, 5 (04): : 822 - 826
- [4] Optimization of Production Plan Based on Linear Multi-objective Programming 2016 3RD INTERNATIONAL CONFERENCE ON MECHANICAL, INDUSTRIAL, AND MANUFACTURING ENGINEERING (MIME 2016), 2016, : 82 - 84
- [6] Linear Programming Solving the Optimization Question of Production Plan MATERIALS SCIENCE AND ENGINEERING, PTS 1-2, 2011, 179-180 : 1162 - 1166
- [7] NUMERICAL ANALYSIS OF STABILITY OF ROCK MASS IN SHIRENGOU IRON MINE, TANGSHAN CITY, FROM OPEN-PIT TO UNDERGROUND MINING CONTROLLING SEISMIC HAZARD AND SUSTAINABLE DEVELOPMENT OF DEEP MINES: 7TH INTERNATIONAL SYMPOSIUM ON ROCKBURST AND SEISMICITY IN MINES (RASIM7), VOL 1 AND 2, 2009, : 1247 - 1250
- [8] Production scheduling in an opencast iron ore mine - a linear programming approach Journal of Mines, Metals and Fuels, 1987, 35 (11): : 463 - 465
- [10] A nonlinear goal-programming-based DE and ANN approach to grade optimization in iron mining NEURAL COMPUTING & APPLICATIONS, 2016, 27 (07): : 2065 - 2081