Simultaneous versus sequential loading and scheduling of flexible assembly systems

被引:19
|
作者
Sawik, T [1 ]
机构
[1] Stanislaw Staszic Univ Min & Met, Fac Management, Dept Comp Integrated Mfg, PL-30059 Krakow, Poland
关键词
D O I
10.1080/002075400418252
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A monolithic and a hierarchical approach is presented for loading and scheduling in a general flexible assembly system and a flexible assembly line. The system is made up of a set of assembly stations of various types each with limited working space and is capable of simultaneously producing a mix of product types. The objective is to determine an assignment of assembly tasks to stations and an assembly schedule for all products so as to complete the products in a minimum time. In the monolithic approach loading and scheduling decisions are made simultaneously. In the hierarchical approach, however, first the station workloads are balanced by solving the loading problem, and then detailed assembly schedule is determined for prefixed task assignments and assembly routes by solving a standard job-shop problem. Mixed integer programming formulations are presented for simultaneous and for sequential loading and scheduling. Loading and scheduling with alternative or with single task assignments are considered. Numerical examples are included to illustrate and compare the two approaches proposed.
引用
收藏
页码:3267 / 3282
页数:16
相关论文
共 50 条
  • [31] Multi agent reinforcement learning for online layout planning and scheduling in flexible assembly systems
    Kaven, Lea
    Huke, Philipp
    Goeppert, Amon
    Schmitt, Robert H.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2024, 35 (08) : 3917 - 3936
  • [32] STABLE, DISTRIBUTED, REAL-TIME SCHEDULING OF FLEXIBLE MANUFACTURING ASSEMBLY DISASSEMBLY SYSTEMS
    PERKINS, JR
    KUMAR, PR
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1989, 34 (02) : 139 - 148
  • [33] AGGREGATE CAPACITATED LOT-SIZE SCHEDULING FOR A CLASS OF FLEXIBLE MACHINING AND ASSEMBLY SYSTEMS
    TOCZYLOWSKI, E
    HINDI, KS
    IIE TRANSACTIONS, 1991, 23 (03) : 259 - 266
  • [34] A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS
    CHOI, JG
    HITOMI, K
    ECON, P
    ECON, PE
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 247 - 255
  • [35] On scheduling of flexible manufacturing systems
    Wu, Xiqi
    Lou, Tong
    Wuhan Gongye Daxue Xuebao/Journal of Wuhan University of Technology, 1995, 17 (02):
  • [36] FLEXIBLE CONTROL OF ASSEMBLY WITH SIMULTANEOUS AVAILABILITY CHECK
    FUCHS, RM
    BUHRING, J
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1989, 79 (05): : 293 - 295
  • [37] Flexible versus rigid tile assembly
    Jonoska, Natasa
    McColm, Gregory L.
    UNCONVENTIONAL COMPUTATION, PROCEEDINGS, 2006, 4135 : 139 - 151
  • [38] Assembly planning in the design of flexible assembly systems
    Stadzisz, PC
    Henrioud, JM
    INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98), 1999, : 133 - 138
  • [39] MODULES IN FLEXIBLE ASSEMBLY SYSTEMS
    BINNIG, H
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1987, 77 (12): : 675 - 678
  • [40] Flow shop scheduling with simultaneous loading on first processor
    Hussain, I
    Khan, MK
    Javed, R
    ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 96), 1996, : 633 - 642