Simultaneous versus sequential loading and scheduling of flexible assembly systems

被引:19
|
作者
Sawik, T [1 ]
机构
[1] Stanislaw Staszic Univ Min & Met, Fac Management, Dept Comp Integrated Mfg, PL-30059 Krakow, Poland
关键词
D O I
10.1080/002075400418252
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A monolithic and a hierarchical approach is presented for loading and scheduling in a general flexible assembly system and a flexible assembly line. The system is made up of a set of assembly stations of various types each with limited working space and is capable of simultaneously producing a mix of product types. The objective is to determine an assignment of assembly tasks to stations and an assembly schedule for all products so as to complete the products in a minimum time. In the monolithic approach loading and scheduling decisions are made simultaneously. In the hierarchical approach, however, first the station workloads are balanced by solving the loading problem, and then detailed assembly schedule is determined for prefixed task assignments and assembly routes by solving a standard job-shop problem. Mixed integer programming formulations are presented for simultaneous and for sequential loading and scheduling. Loading and scheduling with alternative or with single task assignments are considered. Numerical examples are included to illustrate and compare the two approaches proposed.
引用
收藏
页码:3267 / 3282
页数:16
相关论文
共 50 条
  • [21] Simulated annealing approach to machine loading problem in flexible assembly systems
    Sharma, SM
    Viswanadham, N
    1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 3349 - 3354
  • [22] Sequential versus Simultaneous Trust
    Gross, Till
    Servatka, Maros
    Vadovic, Radovan
    JOURNAL OF INSTITUTIONAL AND THEORETICAL ECONOMICS-ZEITSCHRIFT FUR DIE GESAMTE STAATSWISSENSCHAFT, 2020, 176 (03): : 446 - 472
  • [23] Petri net dynamics-based scheduling of flexible manufacturing systems with assembly
    Mu Der Jeng
    Chung Shi Lin
    Yi Sheng Huang
    Journal of Intelligent Manufacturing, 1999, 10 : 541 - 555
  • [24] Petri net dynamics-based scheduling of flexible manufacturing systems with assembly
    Jeng, MD
    Lin, CS
    Huang, YS
    JOURNAL OF INTELLIGENT MANUFACTURING, 1999, 10 (06) : 541 - 555
  • [25] FLEXIBLE ASSEMBLY SYSTEMS
    KREMPEL, F
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1977, 67 (04): : 223 - 227
  • [26] FLEXIBLE ASSEMBLY SYSTEMS
    不详
    ENGINEERING, 1991, 231 (06): : 32 - &
  • [27] More on simultaneous versus sequential LASIK
    Sanchez-Thorin, JC
    OPHTHALMOLOGY, 2000, 107 (05) : 820 - 820
  • [28] Simultaneous versus sequential information processing
    Hoffman, Ross M.
    Kagel, John H.
    Levin, Dan
    ECONOMICS LETTERS, 2011, 112 (01) : 16 - 18
  • [29] AGGREGATE SCHEDULING OF A FLEXIBLE MACHINING AND ASSEMBLY SYSTEM
    KUSIAK, A
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1989, 5 (04): : 451 - 459
  • [30] Iterative Widen Heuristic Beam Search Algorithm for Scheduling Problem of Flexible Assembly Systems
    Li, Xiaoling
    Xing, Keyi
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2021, 17 (11) : 7348 - 7358