A Hybrid Programming Framework for Resource-Constrained Scheduling Problems

被引:1
|
作者
Sitek, Pawel [1 ]
Wikarek, Jaroslaw [1 ]
机构
[1] Tech Univ Kielce, Control & Management Syst Sect, Al Tysiaclecia Panstwa Polskiego 7, PL-25314 Kielce, Poland
关键词
Constraint logic programming; Mathematical programming; Scheduling; Decision support; Hybrid approach;
D O I
10.1007/978-3-319-24834-9_36
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Resource-constrained scheduling problems appear frequently at different levels of decisions in manufacturing, logistics, computer networks, software engineering etc. They are usually characterized by many types of constraints, which often make them unstructured and difficult to solve (NP-complete). Traditional mathematical programming (MP) approaches are deficient because their representation of allocation constraints is artificial (using 0-1 variables). Unlike traditional approaches, declarative constraint logic programming (CLP) provides for a natural representation of heterogeneous constraints. In CLP we state the problem requirements by constraints; we do not need to specify how to meet these requirements. CLP approach is very effective for binary constraints (binding at most two variables). If there are more variables in the constraints and the problem requires further optimization, the efficiency decreases dramatically. This paper presents a hybrid programming framework for constrained scheduling problems where two environments (mathematical programming and constraint logic programming) were integrated. This integration, hybridization as well as a transformation of the problem helped reduce the combinatorial problem substantially. In order to compare the effectiveness of the proposed framework, also made implementation of illustrative example separately for the two environments MP and CLP.
引用
收藏
页码:300 / 308
页数:9
相关论文
共 50 条
  • [1] A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
    Lim, A
    Rodrigues, B
    Thangarajoo, R
    Xiao, F
    [J]. ARTIFICIAL INTELLIGENCE REVIEW, 2004, 22 (03) : 211 - 243
  • [2] Hybrid Approach of Constraint Programming and Integer Programming for Solving Resource-constrained Project-scheduling Problems
    Cheng Zhao
    Murata, Tomohiro
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1574 - 1577
  • [3] A Hybrid Approach to Decision Support for Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Nielsen, Izabela
    Wikarek, Jaroslaw
    Nielsen, Peter
    [J]. INTELLIGENT DECISION TECHNOLOGIES 2016, PT I, 2016, 56 : 101 - 113
  • [4] An adaptive memory programming framework for the resource-constrained project scheduling problem
    Paraskevopoulos, Dimitris C.
    Tarantilis, Christos D.
    Ioannou, George
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4938 - 4956
  • [5] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [6] MILP Formulation for Resource-Constrained Project Scheduling Problems
    Kyriakidis, Thomas S.
    Kopanos, Georgios M.
    Georgiadis, Michael C.
    [J]. 21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 880 - 884
  • [7] A hybrid constraint propagation mechanism for resource-constrained scheduling
    Zhang, JY
    Sun, JG
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 638 - 642
  • [8] SMT encodings for Resource-Constrained Project Scheduling Problems
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [9] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    [J]. INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [10] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721