Experimental Investigation of a 10 MW Prototype Kaplan Turbine during Start-Up Operation

被引:11
|
作者
Dehkharqani, Arash Soltani [1 ]
Engstrom, Fredrik [1 ]
Aidanpaa, Jan-Olov [2 ]
Cervantes, Michel J. [1 ]
机构
[1] Lulea Univ Technol, Div Fluid & Expt Mech, SE-97187 Lulea, Sweden
[2] Lulea Univ Technol, Div Prod & Prod Dev, SE-97187 Lulea, Sweden
关键词
prototype Kaplan turbine; start-up; pressure measurement; strain measurement; axial strain; bending strain; torsion strain; FRANCIS TURBINE; TRANSIENT; LIFE;
D O I
10.3390/en12234582
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
An increase in the start/stop cycles of hydraulic turbines due to the penetration of intermittent renewable energy sources is important. Hydraulic instabilities that occur in hydraulic turbines during start/stops may cause structural issues in the turbine components. High-stress fluctuations on the runner blades are expected during start-ups due to the unsteady pressure loading on the runner blades. This paper presents experiments performed on a 10 MW prototype Kaplan turbine at the Porjus Hydropower Center during a start-up cycle. Synchronized unsteady pressure and strain measurements on a runner blade and axial, bending (in two directions) and torsion strain measurements on the shaft were performed. In addition, the general parameters of the turbine (e.g., rotational speed, guide vane opening and runner blade angle) were acquired. Low-frequency fluctuations (0-15 Hz) were observed in the pressure data on the runner blade after opening the guide vanes from the completely closed position. A higher strain value was observed on the strain gauges installed on the runner blade near the hub (200-500 mu m/m) compared to the ones near the shroud at the leading and trailing edge. The strain fluctuation level on the shaft decreased after loading the generator by further opening the guide vanes. Higher fluctuations were observed in the torsion strain compared to axial and bending strain. In addition, the torsion strain peak-to-peak value reached 12 times its corresponding value at 61% guide vane opening.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Flow Parameter Changes in Steam Turbine 10 MW during Start-Up and Heating
    Hoznedl, Michal
    Tajc, Ladislav
    [J]. 36TH MEETING OF DEPARTMENTS OF FLUID MECHANICS AND THERMODYNAMICS, 2017, 1889
  • [2] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    [J]. ENERGY, 2017, 125 : 345 - 355
  • [3] Numerical Investigation of Flow and Structural Characteristics of a Large High-Head Prototype Pump-Turbine during Turbine Start-Up
    Yin, Xilong
    Huang, Xingxing
    Zhang, Shaozheng
    Bi, Huili
    Wang, Zhengwei
    [J]. ENERGIES, 2023, 16 (09)
  • [4] Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation
    Topel, Monika
    Nilsson, Asa
    Jocker, Markus
    Laumert, Bjorn
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2018, 140 (01):
  • [5] INVESTIGATION INTO THE THERMAL LIMITATIONS OF STEAM TURBINES DURING START-UP OPERATION
    Topel, Monika
    Laumert, Bjorn
    Nilsson, Asa
    Jocker, Markus
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
  • [6] A Study of 10MW Load Commutated Inverter for Gas-Turbine Start-up
    An, Hyunsung
    Cha, Hanju
    [J]. 2018 INTERNATIONAL POWER ELECTRONICS CONFERENCE (IPEC-NIIGATA 2018 -ECCE ASIA), 2018, : 1985 - 1990
  • [7] Operation start-up
    Calvaruso, JT
    [J]. HOSPITALS & HEALTH NETWORKS, 1997, 71 (23): : 34 - 35
  • [8] Preliminary investigation of flow dynamics during the start-up of a bulb turbine model
    Coulaud, M.
    Fraser, R.
    Lemay, J.
    Duquesne, P.
    Aeschlimann, V.
    Deschenes, C.
    [J]. 28TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR2016), PTS 1-12, 2016, 49
  • [9] Experimental investigation of flashback during start-up in practical premixed combustion
    Koseki, H
    Sato, M
    [J]. APPLIED ENERGY, 2002, 73 (3-4) : 237 - 259
  • [10] Improving the power unit operation flexibility by the turbine start-up optimization
    Nowak, Grzegorz
    Rusin, Andrzej
    Lukowicz, Henryk
    Tomala, Martyna
    [J]. ENERGY, 2020, 198