共 50 条
- [1] Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2018, 140 (01):
- [3] AUTOMATIC DEWATERING OF STEAM TURBINES DURING START-UP [J]. BRENNSTOFF-WARME-KRAFT, 1968, 20 (03): : 115 - &
- [6] OPERATIONAL IMPROVEMENTS FOR START-UP TIME REDUCTION IN SOLAR STEAM TURBINES [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 5C, 2014,
- [7] A SIMPLIFIED ANALYTICAL APPROACH FOR CALCULATING THE START-UP TIME OF INDUSTRIAL STEAM TURBINES FOR OPTIMAL AND FAST START-UP PROCEDURES [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 8, 2015,