INVESTIGATION INTO THE THERMAL LIMITATIONS OF STEAM TURBINES DURING START-UP OPERATION

被引:0
|
作者
Topel, Monika [1 ]
Laumert, Bjorn [1 ]
Nilsson, Asa [2 ]
Jocker, Markus [2 ]
机构
[1] KTH Royal Inst Technol, Heat & Power Technol, SE-10044 Stockholm, Sweden
[2] Turbomachinery AB, Siemens Ind, SE-61283 Finspang, Sweden
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Liberalized electricity market conditions and concentrating solar power technologies call for increased power plant operational flexibility. Concerning the steam turbine component, one key aspect of its flexibility is the capability for fast starts. In current practice, turbine start-up limitations are set by consideration of thermal stress and low cycle fatigue. However, the pursuit of faster starts raises the question whether other thermal phenomena can become a limiting factor to the start-up process. Differential expansion is one of such thermal properties, especially since the design of axial clearances is not included as part of start-up schedule design and because its measurement during operation is often limited or not a possibility at all. The aim of this work is to understand differential expansion behavior with respect to transient operation and to quantify the effect that such operation would have in the design and operation of axial clearances. This was accomplished through the use of a validated thermo-mechanical model that was used to compare differential expansion behavior for different operating conditions of the machine. These comparisons showed that faster starts do not necessarily imply that wider axial clearances are needed, which means that the thermal flexibility of the studied turbine is not limited by differential expansion. However, for particular locations it was also obtained that axial rubbing can indeed become a limiting factor in direct relation to start-up operation. The resulting approach presented in this work serves to avoid over-conservative limitations in both design and operation concerning axial clearances.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation
    Topel, Monika
    Nilsson, Asa
    Jocker, Markus
    Laumert, Bjorn
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2018, 140 (01):
  • [2] STEAM-TURBINES AT START-UP OPERATION
    HOHN, A
    [J]. BRENNSTOFF-WARME-KRAFT, 1974, 26 (08): : 344 - 351
  • [3] AUTOMATIC DEWATERING OF STEAM TURBINES DURING START-UP
    不详
    [J]. BRENNSTOFF-WARME-KRAFT, 1968, 20 (03): : 115 - &
  • [4] STEAM-TURBINES ON START-UP
    HOHN, A
    [J]. COMBUSTION, 1976, 47 (08): : 23 - 32
  • [5] STEAM-TURBINES ON START-UP
    HOHN, A
    [J]. BROWN BOVERI REVIEW, 1975, 62 (06): : 232 - 241
  • [6] OPERATIONAL IMPROVEMENTS FOR START-UP TIME REDUCTION IN SOLAR STEAM TURBINES
    Topel, Monika
    Genrup, Magnus
    Jocker, Markus
    Spelling, James
    Laumert, Bjorn
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 5C, 2014,
  • [7] A SIMPLIFIED ANALYTICAL APPROACH FOR CALCULATING THE START-UP TIME OF INDUSTRIAL STEAM TURBINES FOR OPTIMAL AND FAST START-UP PROCEDURES
    Beer, Wolfgang
    Propp, Lukas
    Voelker, Lutz
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 8, 2015,
  • [8] Operation start-up
    Calvaruso, JT
    [J]. HOSPITALS & HEALTH NETWORKS, 1997, 71 (23): : 34 - 35
  • [9] Thermodynamic modeling based optimization for thermal systems in heat recovery steam generator during cold start-up operation
    Sindareh-Esfahani, Peyman
    Ghaffari, Ali
    Ahmadi, Pouria
    [J]. APPLIED THERMAL ENGINEERING, 2014, 69 (1-2) : 286 - 296
  • [10] Analysis of thermal stress evolution in the steam drum during start-up of a heat recovery steam generator
    Kim, TS
    Lee, DK
    Ro, ST
    [J]. APPLIED THERMAL ENGINEERING, 2000, 20 (11) : 977 - 992