共 50 条
- [1] Operational Improvements for Startup Time Reduction in Solar Steam Turbines [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2015, 137 (04):
- [4] Thermal Modeling of a Solar Steam Turbine With a Focus on Start-Up Time Reduction [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2012, 134 (01):
- [5] THERMAL MODELING OF A SOLAR STEAM TURBINE WITH A FOCUS ON START-UP TIME REDUCTION [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 3, 2012, : 1021 - 1030
- [7] A SIMPLIFIED ANALYTICAL APPROACH FOR CALCULATING THE START-UP TIME OF INDUSTRIAL STEAM TURBINES FOR OPTIMAL AND FAST START-UP PROCEDURES [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 8, 2015,
- [8] AUTOMATIC DEWATERING OF STEAM TURBINES DURING START-UP [J]. BRENNSTOFF-WARME-KRAFT, 1968, 20 (03): : 115 - &
- [9] INVESTIGATION INTO THE THERMAL LIMITATIONS OF STEAM TURBINES DURING START-UP OPERATION [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 8, 2017,
- [10] Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2018, 140 (01):