OPERATIONAL IMPROVEMENTS FOR START-UP TIME REDUCTION IN SOLAR STEAM TURBINES

被引:0
|
作者
Topel, Monika [1 ]
Genrup, Magnus [2 ]
Jocker, Markus [3 ]
Spelling, James [1 ]
Laumert, Bjorn [1 ]
机构
[1] Royal Inst Technol, Heat & Power Technol, SE-10044 Stockholm, Sweden
[2] Lund Univ, Energy Sci, SE-22100 Lund, Sweden
[3] Siemens Ind, Turbomachinery AB, SE-61283 Finspang, Sweden
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
Solar steam turbines are subject to high thermal stresses as a result of temperature gradients during transient operation, which occurs more frequently due to the variability of the solar resource. In order to increase the flexibility of the turbines while preserving lifing requirements, several operational modifications for maintaining turbine temperatures during offline periods are proposed and investigated. The modifications were implemented in a dynamic thermal turbine model and the potential improvements were quantified. The modifications studied included: increasing the gland steam pressure injected to the end-seals, increasing the back pressure and increasing the barring speed. These last two take advantage of the ventilation and friction work. The effects of the modifications were studied both individually as well as in different combinations. The temperatures obtained when applying the combined modifications were compared to regular turbine cool-down temperatures and showed significant improvements on the start-up times of the turbine.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] OPTIMIZING OPERATIONAL CONTROL OF START-UP IN PRODUCTION OF OPTICAL COMPONENTS
    VATNIK, PA
    LIVSHIFTS, SB
    [J]. SOVIET JOURNAL OF OPTICAL TECHNOLOGY, 1977, 44 (04): : 231 - 233
  • [32] Optimization of start-up scheduling and life assessment for a steam turbine
    Ji Dong-mei
    Sun Jia-qi
    Sun Quan
    Guo Heng-Chao
    Ren Jian-Xing
    Zhu Quan-jun
    [J]. ENERGY, 2018, 160 : 19 - 32
  • [33] Optimization of steam turbine start-up based on nonlinear function
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 505 - 510
  • [34] AUTOMATION PROCESSES FOR THE HOT START-UP OF STEAM-GENERATORS
    BRECKNER, K
    [J]. BRENNSTOFF-WARME-KRAFT, 1992, 44 (06): : 279 - 280
  • [35] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    [J]. ENERGY, 2017, 125 : 345 - 355
  • [36] Optimization of start-up curves and real-time start-up guide for power station boilers
    Yuan, Zhenfu
    Zhou, Jie
    Ning, Ankun
    Pu, Xingguo
    Cen, Kefa
    Zhao, Jinlong
    Xu, Aishi
    Liu, Xuguan
    [J]. Dongli Gongcheng/Power Engineering, 1997, 17 (04): : 40 - 45
  • [37] Modeling and Control of the Starter Motor and Start-Up Phase for Gas Turbines
    Jafari, Soheil
    Fashandi, Seyed Alireza Miran
    Nikolaidis, Theoklis
    [J]. ELECTRONICS, 2019, 8 (03):
  • [38] Start-up Vibration Analysis for Novelty Detection on Industrial Gas Turbines
    Zhang, Yu
    Cniz-Manzo, Samuel
    Latimer, Anthony
    [J]. 2016 INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (INDEL), 2016,
  • [39] Analysis to speed up of the start-up of steam boiler OP-380
    [J]. Taler, J. (taler@mech.pk.edu.pl), 1600, Warsaw University of Technology (94):
  • [40] Analysis to speed up of the start-up of steam boiler OP-380
    Taler, Jan
    Weglowski, Bohdan
    Dzierwa, Piotr
    Czuprynski, Piotr
    Madejski, Pawel
    Nabaglo, Daniel
    Zyrkowski, Cezary
    [J]. JOURNAL OF POWER TECHNOLOGIES, 2014, 94 (02):