共 50 条
- [21] An MBO Algorithm for a Flow Shop Problem with Sequence-Dependent Setup Times [J]. PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 2471 - 2474
- [22] A dual-criteria flow shop scheduling with sequence-dependent setup times [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2015, 36 (05): : 485 - 500
- [23] Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 2990 - 2995
- [25] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers [J]. The International Journal of Advanced Manufacturing Technology, 2012, 58 : 309 - 325
- [27] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
- [29] Scheduling unrelated parallel machines with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496