Control of lifting desired number of steel plates and automatic crane operation

被引:1
|
作者
Kim, HJ [1 ]
Hwang, SK [1 ]
Lee, JS [1 ]
机构
[1] Pohang Univ Sci & Technol, Dept Elect & Elect Engn, Pohang 790784, South Korea
关键词
overhead magnet crane system; magnet voltage control; load cell; magnetic flux sensor; on-line tuning look-up table;
D O I
10.2355/isijinternational.43.230
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper presents an automation scheme for an overhead magnet crane that is a critical component of thick steel plate storage yard automation. First, the load cells and magnetic flux sensors are introduced to detect the number of steel plates lifted using the magnet crane. Then a voltage control algorithm to lift the ordered number of steel plates is proposed and implemented by using the on-line tuning look-up table. Finally, the overall hardware and software description for automatic crane operation is presented. The results have been successfully implemented in POSCO's No. 2 thick steel plate storage yard.
引用
收藏
页码:230 / 237
页数:8
相关论文
共 50 条
  • [21] OPTIMAL-CONTROL OF AN OFFSHORE LIFTING OPERATION
    MJELDE, KM
    LEE, PCS
    QVAM, W
    JACOBSEN, HP
    ROONEY, P
    TEGN, F
    MODELING IDENTIFICATION AND CONTROL, 1984, 5 (02) : 123 - 128
  • [22] Automation of crane control for block lifting based on deep reinforcement learning
    Chun, Do-Hyun
    Roh, Myung-Il
    Lee, Hye-Won
    JOURNAL OF COMPUTATIONAL DESIGN AND ENGINEERING, 2022, 9 (04) : 1430 - 1448
  • [23] Crane Operation Hazard Evaluation Based on Z-Number and CPT
    Li, Aihua
    IEEE ACCESS, 2024, 12 : 70911 - 70925
  • [24] Control of load's speed of ascent in crane operation
    Remizovich Y.V.
    Russian Engineering Research, 2012, 32 (7-8) : 529 - 531
  • [25] THE ANALYSIS OF THE JOINT LIMITATION CONDITION OF WAVE HEIGHT-PERIOD ON THE FLOATING CRANE LIFTING OPERATION
    Wang, Xue-gang
    Ying, Zong-quan
    Chen, Ze-cong
    PROCEEDINGS OF THE ASME 38TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2019, VOL 9, 2019,
  • [26] AUTOMATIC CRANE CONTROL-SYSTEM FOR HEAVY PLATE
    不详
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (08): : T109 - T112
  • [27] Vision servo control for automatic positioning of hoisting crane
    Tong, Shenghao
    Zhang, Ke
    Shi, Huaitao
    Zhao, Jinbao
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2022, 54 (01): : 149 - 155
  • [28] Automatic Coil-handling Crane Control System
    Choi, Chintae
    You, Ki Sung
    Jeong, Hee Don
    2008 SECOND INTERNATIONAL CONFERENCE ON FUTURE GENERATION COMMUNICATION AND NETWORKING SYMPOSIA, VOLS 1-5, PROCEEDINGS, 2008, : 472 - 475
  • [29] The Secondary Lifting Performance of Crawler Crane Under Delay Coefficient Control Strategy
    Zhang, Jin
    Du, Ranheng
    Zhang, Kuo
    Zhang, Yin
    Li, Ying
    Chen, Xing
    MACHINES, 2025, 13 (02)
  • [30] Methods of Determining the Desired Frequency Characteristics of the Automatic Control Systems
    Ablesimov, A. K.
    Pylypenko, M. A.
    Pogribnyak, L. V.
    Usenko, N. V.
    2016 4TH INTERNATIONAL CONFERENCE ON METHODS AND SYSTEMS OF NAVIGATION AND MOTION CONTROL (MSNMC), 2016, : 189 - 192