Optimal inspection and replacement strategy for 145 kV gas-insulated switchgear

被引:3
|
作者
Han, Young Jin [1 ]
Zhao, Qian Qian [2 ]
Yun, Won Young [2 ]
机构
[1] Ulsan Coll, Ulsan, South Korea
[2] Pusan Natl Univ, Dept Ind Engn, 30 Jangjeon Dong, Busan 609735, South Korea
关键词
GIS; RCM; FMECA; LTA; simulation; RELIABILITY-CENTERED MAINTENANCE; COMPREHENSIVE SCHEME; FAILURE; SYSTEMS;
D O I
10.1177/1748006X19893540
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We deal with an optimization problem of planning a maintenance strategy for 145 kV gas-insulated switchgear and apply reliability-centered maintenance approach to find an efficient and effective strategy. In a three-step sequential process, we use failure mode effects and criticality analysis to define the critical failure modes that cause the major failures of 145 kV gas-insulated switchgear, select the maintenance significant items to remove the major failure modes, and finally apply logic tree analysis to assign the appropriate maintenance task to each critical failure modes in the system. We then compare the assigned maintenance tasks with existing tasks in the installation, operation, and maintenance manuals developed in the system design and development phase. The assigned maintenance tasks in this study are compared with those in the system design and development phase by simulation, and a simple heuristic method is proposed to find optimal solutions.
引用
收藏
页码:339 / 347
页数:9
相关论文
共 50 条
  • [31] Research on Gas-Insulated Switchgear flashover fault location system
    Xie Shuang
    Zhu Jialin
    Zhu Shilong
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONICS, NETWORK AND COMPUTER ENGINEERING (ICENCE 2016), 2016, 67 : 680 - 684
  • [32] 800 KV GAS INSULATED SWITCHGEAR.
    Oishi, Motoyuki
    Ozaki, Yasuo
    Yanabu, Satoru
    Toshiba review International ed., 1986, (155): : 8 - 12
  • [33] Damping of VFTO in Gas-Insulated Switchgear by a New Coating Material
    Szewczyk, Marcin
    Piasecki, Wojciech
    Stosur, Mariusz
    Florkowski, Marek
    Riechert, Uwe
    IEEE TRANSACTIONS ON POWER DELIVERY, 2016, 31 (06) : 2553 - 2558
  • [34] Recent trend of technical requirements for aged gas-insulated switchgear
    Goto, Akihiko
    Mochizuki, Tetsuo
    Otsuka, Takuya
    IEEJ Transactions on Power and Energy, 2015, 135 (09) : 533 - 537
  • [35] Computer-aided development of HV gas-insulated switchgear
    Michaelis, Deitel
    Peilz, Theodor
    Rees, Volker
    ABB Review, 1993, (05): : 29 - 34
  • [37] Partial discharge early warning system in gas-insulated switchgear
    Meijer, S
    Smit, JJ
    Gulski, E
    Girodet, A
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 931 - 936
  • [38] 550 KV SF6 GAS-INSULATED SWITCHGEAR FOR THE ITAIPU HYDRO-POWER STATION
    SZENTEVARGA, HP
    BROWN BOVERI REVIEW, 1981, 68 (3-4): : 157 - 159
  • [39] Determination of Breakdown Voltage Characteristics of 1'100 kV Disconnector for Modeling of VFTO in Gas-Insulated Switchgear
    Szewczyk, Marcin
    Kuniewski, Maciej
    Piasecki, Wojciech
    Florkowski, Marek
    Straumann, Ueli
    IEEE TRANSACTIONS ON POWER DELIVERY, 2016, 31 (05) : 2151 - 2158
  • [40] Measurement of Multipath Transients in Secondary Cables Near a 500 kV Gas-Insulated Switchgear During Operations
    Liu, Zhuoran
    Cui, Yunguang
    Zhang, Bo
    He, Jinliang
    IEEE TRANSACTIONS ON POWER DELIVERY, 2023, 38 (02) : 917 - 925