Optimal inspection and replacement strategy for 145 kV gas-insulated switchgear

被引:3
|
作者
Han, Young Jin [1 ]
Zhao, Qian Qian [2 ]
Yun, Won Young [2 ]
机构
[1] Ulsan Coll, Ulsan, South Korea
[2] Pusan Natl Univ, Dept Ind Engn, 30 Jangjeon Dong, Busan 609735, South Korea
关键词
GIS; RCM; FMECA; LTA; simulation; RELIABILITY-CENTERED MAINTENANCE; COMPREHENSIVE SCHEME; FAILURE; SYSTEMS;
D O I
10.1177/1748006X19893540
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We deal with an optimization problem of planning a maintenance strategy for 145 kV gas-insulated switchgear and apply reliability-centered maintenance approach to find an efficient and effective strategy. In a three-step sequential process, we use failure mode effects and criticality analysis to define the critical failure modes that cause the major failures of 145 kV gas-insulated switchgear, select the maintenance significant items to remove the major failure modes, and finally apply logic tree analysis to assign the appropriate maintenance task to each critical failure modes in the system. We then compare the assigned maintenance tasks with existing tasks in the installation, operation, and maintenance manuals developed in the system design and development phase. The assigned maintenance tasks in this study are compared with those in the system design and development phase by simulation, and a simple heuristic method is proposed to find optimal solutions.
引用
收藏
页码:339 / 347
页数:9
相关论文
共 50 条
  • [21] Design of permanent magnet motor actuator used in 550 kV gas-insulated switchgear disconnector
    Shi, Kejian
    Lin, Xin
    Xu, Jianyuan
    ADVANCES IN MECHANICAL ENGINEERING, 2015, 7 (03) : 1 - 9
  • [22] Mitigating 161 kV electromagnetic potential transformers' ferroresonance with damping reactors in a gas-insulated switchgear
    Tseng, K. -H.
    Cheng, P. -Y.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2011, 5 (04) : 479 - 488
  • [23] LIGHTNING OVERVOLTAGE PROTECTION OF THE PADDOCK 362-145 KV GAS-INSULATED SUBSTATION
    ELAHI, H
    SUBLICH, M
    ANDERSON, ME
    NELSON, BD
    IEEE TRANSACTIONS ON POWER DELIVERY, 1990, 5 (01) : 144 - 150
  • [24] Streamer Criterion for Designing Gas-Insulated Medium Voltage Switchgear
    Tefferi, Mattewos
    Pyle, Foster
    Laso, Andres
    Dauksas, Arturas
    Darko, Kennedy
    Uzelac, Nenad
    Scott, Adrian
    Xu, Weiran
    2022 IEEE CONFERENCE ON ELECTRICAL INSULATION AND DIELECTRIC PHENOMENA (IEEE CEIDP 2022), 2022, : 451 - 454
  • [25] COUPLING DEVICES FOR THE DETECTION OF PARTIAL DISCHARGES IN GAS-INSULATED SWITCHGEAR
    BOGGS, SA
    FORD, GL
    MADGE, RC
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (08): : 3969 - 3973
  • [26] Experimental Research on Very-Fast Transient Overvoltage in 1100-kV Gas-Insulated Switchgear
    Shu, Yinbiao
    Chen, Weijiang
    Li, Zhibing
    Dai, Min
    Li, Chengrong
    Liu, Weidong
    Yan, Xianglian
    IEEE TRANSACTIONS ON POWER DELIVERY, 2013, 28 (01) : 458 - 466
  • [27] Condition Assessment of Gas-Insulated Switchgear Based on Multiple Information
    Xu, Honghua
    Wang, Chunning
    Wang, Taoyun
    Yang, Lanying
    Ma, Hongzhong
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 1278 - 1282
  • [28] Development of highly reliable control systems for the gas-insulated switchgear
    Mizuno, K
    Tsutsumi, M
    Matsumura, M
    Yagi, Y
    IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (01) : 219 - 226
  • [29] DISCHARGE-BASED DIAGNOSTICS IN POLLUTED GAS-INSULATED SWITCHGEAR
    Elmashtoly, Mohamed H.
    Anis, Hussein I.
    2018 TWENTIETH INTERNATIONAL MIDDLE EAST POWER SYSTEMS CONFERENCE (MEPCON), 2018, : 373 - 376
  • [30] SF6 GAS-INSULATED SWITCHGEAR FOR ALL APPLICATIONS
    SZENTEVARGA, HP
    TECCHIO, P
    BROWN BOVERI REVIEW, 1983, 70 (1-2): : 81 - 86