A two-stage model for asynchronously scheduling offshore wind farm maintenance tasks and power productions

被引:18
|
作者
Zhang, Bingying [1 ]
Zhang, Zijun [1 ]
机构
[1] City Univ Hong Kong, Sch Data Sci, 83 Tat Chee Ave, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Wind farms; Power production; Robust optimization; Scheduling model; Operations and maintenance; ROBUST OPTIMIZATION; DECISION-SUPPORT; VESSEL FLEET; OPERATIONS; COST; RISK;
D O I
10.1016/j.ijepes.2021.107013
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper studies the model for scheduling both offshore wind farm maintenance tasks and power productions in consideration of their distinct scheduling timescales and the wind power uncertainty. A two-stage adaptive robust optimization model is formulated to derive the optimal schedule, which well handles wind turbine maintenance tasks and maximizes wind farm power productions by anticipating the worst wind power output scenario based on a wind power uncertainty set and a set of metocean conditions. In two decision stages, we schedule maintenance tasks daily and power productions hourly respectively. The proposed model is equivalently transformed to a form which can be efficiently solved by the column-and-constraint generation algorithm. Numerical experiments demonstrate the effectiveness and applicability of the proposed model considering wind farms of different large sizes. Results show that the developed model can maximize the total power production of the wind farm and enhance the robustness of obtained maintenance schedules against the wind power uncertainty.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Reliability-Centered Maintenance Scheduling Considering Failure Rates Uncertainty: A Two-Stage Robust Model
    Alizadeh, Ali
    Fereidunian, Alireza
    Moghimi, Mojtaba
    Lesani, Hamid
    IEEE TRANSACTIONS ON POWER DELIVERY, 2022, 37 (03) : 1941 - 1951
  • [42] A Crew Scheduling Model to Incrementally Optimize Workforce Assignments for Offshore Wind Farm Constructions
    Rippel, Daniel
    Foroushani, Fatemeh Abasian
    Luetjen, Michael
    Freitag, Michael
    ENERGIES, 2021, 14 (21)
  • [43] Validation of copula-based weather generator for maintenance model of offshore wind farm
    Skobiej, Bartosz
    Niemi, Arto
    WMU JOURNAL OF MARITIME AFFAIRS, 2022, 21 (01) : 73 - 87
  • [44] Two-stage power system restoration model
    Yang, Hong
    Tang, Zhen
    Wang, Wei
    Xue, Zhihang
    Global Energy Interconnection, 2024, 7 (06) : 773 - 785
  • [45] Validation of copula-based weather generator for maintenance model of offshore wind farm
    Bartosz Skobiej
    Arto Niemi
    WMU Journal of Maritime Affairs, 2022, 21 : 73 - 87
  • [46] Two-stage power system restoration model
    Hong Yang
    Zhen Tang
    Wei Wang
    Zhihang Xue
    Global Energy Interconnection, 2024, 7 (06) : 773 - 785
  • [47] Two-stage stochastic scheduling model of wind-photovoltaic-storage providing flexible ramp capacity
    Huang, Ruanming
    He, Xinqin
    Zhao, Jingjing
    Fei, Fei
    Guo, Mingxing
    FOURTH INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2020, 467
  • [48] Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production
    Huang, Rong-Hwa
    Yu, Shun-Chi
    JOURNAL OF CLEANER PRODUCTION, 2016, 135 : 276 - 283
  • [49] Integrated two-stage multi-factory assembly scheduling with maintenance considerations
    Kazemi, Hamed
    Nourelfath, Mustapha
    Fathollahi-Fard, Amir M.
    Gendreau, Michel
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (06) : 2133 - 2149
  • [50] A Two-Stage Planning Model for Power Scheduling in a Hydro-Thermal System Under Uncertainty
    Nuernberg, Robert
    Roemisch, Werner
    OPTIMIZATION AND ENGINEERING, 2002, 3 (04) : 355 - 378