Approximation Schemes for Single-Machine Scheduling with a Fixed Maintenance Activity to Minimize the Total Amount of Late Work

被引:49
|
作者
Yin, Yunqiang [1 ]
Xu, Jianyou [2 ]
Cheng, T. C. E. Edwin [3 ]
Wu, Chin-Chia [4 ]
Wang, Du-Juan [5 ]
机构
[1] Kunming Univ Sci & Technol, Dept Math, Kunming 650093, Peoples R China
[2] Northeastern Univ, Dept Automat, Coll Informat Sci & Engn, Shenyang 110819, Peoples R China
[3] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[4] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
[5] Dalian Univ Technol, Inst Informat & Decis Technol, Sch Management Sci & Engn, Dalian 116023, Peoples R China
基金
中国国家自然科学基金;
关键词
scheduling; late work; fully polynomial-time approximation scheme; 2-MACHINE FLOWSHOP PROBLEM; TIME MINIMIZATION; ALGORITHMS; CRITERION; SUM;
D O I
10.1002/nav.21684
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo-polynomial dynamic programming algorithms and a fully polynomial-time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. (C) 2016 Wiley Periodicals, Inc.
引用
收藏
页码:172 / 183
页数:12
相关论文
共 50 条
  • [31] Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
    Kress, Dominik
    Barketau, Maksim
    Pesch, Erwin
    JOURNAL OF SCHEDULING, 2018, 21 (06) : 595 - 606
  • [32] Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
    Geng, Zhi-Chao
    Zhang, Yuan
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2023, 11 (03) : 693 - 706
  • [33] Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
    Zhi-Chao Geng
    Yuan Zhang
    Journal of the Operations Research Society of China, 2023, 11 : 693 - 706
  • [34] A single machine scheduling problem to minimize total early work
    Ben-Yehoshua, Yoav
    Mosheiov, Gur
    COMPUTERS & OPERATIONS RESEARCH, 2016, 73 : 115 - 118
  • [35] Single machine scheduling to minimize a modified total late work function with multiple due dates
    Kethley, R. Bryan
    Alidaee, Bahram
    Wang, Haibo
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2014, 2 (01): : 624 - 639
  • [36] Single-machine scheduling to minimize makespan with deterioration jobs and multi-maintenance activities
    Hsu, Chou-Jung
    Chen, Hung-Chi
    MATERIAL DESIGN, PROCESSING AND APPLICATIONS, PARTS 1-4, 2013, 690-693 : 3007 - 3013
  • [37] Improved Approaches to Minimize the Makespan on Single-Machine Scheduling with Periodic Preventive Maintenance Activities
    Zhou, Hongming
    Tsai, Ya-Chih
    Wu, Ful-Chiang
    Huang, Shenquan
    Chou, Fuh-Der
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [38] Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness
    Wang, Ting
    Xu, Dehua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [39] Single-machine scheduling to stochastically minimize maximum lateness
    Cai, Xiaoqiang
    Wang, Liming
    Zhou, Xian
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 293 - 301
  • [40] A self-adaptive metaheuristic to minimize the total weighted tardiness for a single-machine scheduling problem with flexible and variable maintenance
    Corsini, Roberto Rosario
    Fichera, Valeria
    Longo, Leonardo
    Oriti, Giuseppe
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2024,