Improved Approaches to Minimize the Makespan on Single-Machine Scheduling with Periodic Preventive Maintenance Activities

被引:1
|
作者
Zhou, Hongming [1 ]
Tsai, Ya-Chih [2 ]
Wu, Ful-Chiang [2 ]
Huang, Shenquan [1 ]
Chou, Fuh-Der [1 ]
机构
[1] Wenzhou Univ, Coll Mech & Elect Engn, Wenzhou 325035, Zhejiang, Peoples R China
[2] Vanung Univ, Dept Hotel Management, Taoyuan, Taiwan
基金
中国国家自然科学基金;
关键词
TOTAL COMPLETION-TIME; DETERIORATING JOBS; ALGORITHM;
D O I
10.1155/2020/8548463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a single-machine scheduling problem with periodic preventive maintenance activities that are predeterministic so that the machine is not available all the time, and jobs have to be processed between two consecutive maintenance periods. We propose a mixed integer programming (MIP) model and two heuristics to minimize the makespan. With more constraints in our model, the model is more efficient than the recent model of Perez-Gonzalez and Framinan , and our model could solve problems with up to fifty jobs. Two heuristic algorithms, namely, H (MW) and H (LB*), are also proposed, in which two bin-packing policies of the minimum waste and minimum lower bound are used, respectively. Furthermore, we also proposed an improvement procedure. The results showed that the heuristic H (MW) outperformed other heuristics of the paper, indicating that the bin-packing policy of the minimum waste is more effective than well-known ones such as full batch and best fit. Additionally, all the heuristic algorithms addressed in this paper combined with the improvement procedure could achieve a similar and high quality of solutions with a very tiny increase in computational expense.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Single-machine scheduling with periodic maintenance to minimize makespan
    Ji, Min
    He, Yong
    Cheng, T. C. E.
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (06) : 1764 - 1770
  • [2] Single-machine scheduling with periodic maintenance to minimize makespan revisited
    Yu, Xianyu
    Zhang, Yulin
    Steiner, George
    JOURNAL OF SCHEDULING, 2014, 17 (03) : 263 - 270
  • [3] Single-machine scheduling with periodic maintenance to minimize makespan revisited
    Xianyu Yu
    Yulin Zhang
    George Steiner
    Journal of Scheduling, 2014, 17 : 263 - 270
  • [4] A single-machine scheduling problem with maintenance activities to minimize makespan
    Hsu, Chou-Jung
    Low, Chinyao
    Su, Chwen-Tzeng
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 215 (11) : 3929 - 3935
  • [5] Single-machine scheduling to minimize makespan with deterioration jobs and multi-maintenance activities
    Hsu, Chou-Jung
    Chen, Hung-Chi
    MATERIAL DESIGN, PROCESSING AND APPLICATIONS, PARTS 1-4, 2013, 690-693 : 3007 - 3013
  • [6] Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
    Sbihi, Mohammed
    Varnier, Christophe
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (04) : 830 - 840
  • [7] Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
    Chen, Jen-Shiang
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (01) : 90 - 102
  • [8] Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities
    Yang, Suh-Jenq
    Yang, Dar-Li
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (06): : 528 - 533
  • [9] Optimal algorithms for single-machine scheduling with rejection to minimize the makespan
    Lu, Lingfa
    Ng, C. T.
    Zhang, Liqi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (02) : 153 - 158
  • [10] A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan"
    Xu, Dehua
    Yin, Yunqiang
    Li, Hongxing
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (02) : 825 - 827