共 50 条
- [1] Timed Automata Models for Batch Scheduling with Sequence-Dependent Changeovers [J]. 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 1515 - 1520
- [2] Scheduling Multistage Batch Plants with Sequence-Dependent Changeovers [J]. AICHE JOURNAL, 2009, 55 (08) : 2122 - 2137
- [4] The Capacitated Production Planning Problem with Sequence-Dependent Changeovers [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2363 - +
- [7] Short-Term Scheduling of Multi-Product Batch Plants with Sequence-Dependent Changeovers Using Timed Automata Models [J]. 20TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2010, 28 : 1201 - 1206
- [8] Optimal Scheduling of Multistage, Multiproduct, Batch Plants with Parallel Units and Sequence Dependent Changeovers [J]. 19TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2009, 26 : 405 - 409