A general resource-constrained scheduling framework for multistage batch facilities with sequence-dependent changeovers

被引:21
|
作者
Marchetti, Pablo A. [1 ]
Cerda, Jaime [1 ]
机构
[1] INTEC Univ Nacl Litoral CONICET, RA-3000 Santa Fe, Argentina
关键词
Resource-constrained scheduling; Multiproduct batch plant; MILP optimization model; CONTINUOUS-TIME FORMULATION; PARALLEL PRODUCTION LINES; MILP FORMULATION; PROGRAMMING MODEL; PLANTS; MULTIPRODUCT; OPERATIONS; ALGORITHM;
D O I
10.1016/j.compchemeng.2008.12.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This work introduces a new MILP sequential approach to the short-term scheduling of multistage batch plants that accounts for sequence-dependent changeover times, intermediate due dates and limited availability of renewable resources. It relies on a continuous-time formulation based on the general precedence notion that uses different sets of binary variables to handle allocation and sequencing decisions. To avoid resource overloading, additional constraints in terms of sequencing variables and a new set of 0-1 overlapping variables are presented. They allow tracking the set of tasks requiring the same resource and running in parallel at the start of another process operation. In this way, the proposed formulation involves a reasonable number of binary variables and constraints and features a very good computational behavior, even in the presence of hard bottleneck resources. Four illustrative examples, one of them including multiple bottleneck resources shared by several processing stages, have been efficiently solved. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:871 / 886
页数:16
相关论文
共 50 条
  • [1] Scheduling Multistage Batch Plants with Sequence-Dependent Changeovers
    Castro, Pedro M.
    Novais, Augusto Q.
    [J]. AICHE JOURNAL, 2009, 55 (08) : 2122 - 2137
  • [2] An approximate mathematical framework for resource-constrained multistage batch scheduling
    Marchetti, Pablo A.
    Cerda, Jaime
    [J]. CHEMICAL ENGINEERING SCIENCE, 2009, 64 (11) : 2733 - 2748
  • [3] Greedy Algorithm for Scheduling Batch Plants with Sequence-Dependent Changeovers
    Castro, Pedro M.
    Harjunkoski, Iiro
    Grossmann, Ignacio E.
    [J]. AICHE JOURNAL, 2011, 57 (02) : 373 - 387
  • [4] Timed Automata Models for Batch Scheduling with Sequence-Dependent Changeovers
    Subbiah, Subanatarajan
    Engell, Sebastian
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 1515 - 1520
  • [5] Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2008, 47 (04) : 1159 - 1183
  • [6] Optimal Scheduling of Multistage, Multiproduct, Batch Plants with Parallel Units and Sequence Dependent Changeovers
    Castro, Pedro M.
    Novais, Augusto Q.
    [J]. 19TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2009, 26 : 405 - 409
  • [7] A comprehensive CP approach for the scheduling of resource-constrained multiproduct multistage batch plants
    Novara, Franco M.
    Novas, Juan M.
    Henning, Gabriela P.
    [J]. 23 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2013, 32 : 589 - 594
  • [8] Planning models for parallel batch reactors with sequence-dependent changeovers
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    [J]. AICHE JOURNAL, 2007, 53 (09) : 2284 - 2300
  • [9] An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    Méndez, CA
    Henning, GP
    Cerdá, J
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2001, 25 (4-6) : 701 - 711
  • [10] A Continuous-Time Tightened Formulation for Single-Stage Batch Scheduling with Sequence-Dependent Changeovers
    Marchetti, Pablo A.
    Cerda, Jaime
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (01) : 483 - 498