Planning models for parallel batch reactors with sequence-dependent changeovers

被引:36
|
作者
Erdirik-Dogan, Muge [1 ]
Grossmann, Ignacio E. [1 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
关键词
planning; scheduling; batch operations; mixed-integer programming;
D O I
10.1002/aic.11249
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this article we address the production planning of parallel multiproduct batch reactors with sequence-dependent changeovers, a challenging problem that has been motivated by a real-world application of a specialty chemicals business. We propose two production planning models that anticipate the impact of the changeovers in this batch processing problem. The first model is based on underestimating the effects of the changeovers that leads to an MILP problem of moderate size. The second model incorporates sequencing constraints that yield very accurate predictions, but at the expense of a larger MILP problem. To solve large scale problems in terms of number of products and reactors, or length of the time horizon, we propose a decomposition technique based on rolling horizon scheme and also a relaxation of the detailed planning model. Several examples are presented to illustrate the performance of the proposed models. (C) 2007 American Institute of Chemical Engineers.
引用
收藏
页码:2284 / 2300
页数:17
相关论文
共 50 条
  • [21] Scheduling unrelated parallel machines with sequence-dependent setups
    Logendran, Rasaratnam
    McDonell, Brent
    Smucker, Byran
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (11) : 3420 - 3438
  • [22] A general MILP model for scheduling of batch process with sequence-dependent changeover
    Wu, JY
    He, XR
    Chen, BZ
    Qiu, T
    [J]. PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 1076 - 1081
  • [23] Parallel Servers Scheduling with Dynamic Sequence-Dependent Setup Time
    Thanh-Cong Dinh
    Bae, Hyerim
    [J]. INTELLIGENT DECISION TECHNOLOGIES (IDT'2012), VOL 2, 2012, 16 : 79 - 87
  • [24] Scheduling unrelated parallel machines with sequence-dependent setup times
    Zeidi, Javad Rezaeian
    MohammadHosseini, Samir
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
  • [25] Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints
    Hu, Dayong
    Yao, Zhenqiang
    [J]. ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2528 - 2531
  • [26] Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    Kang, S
    Malik, K
    Thomas, LJ
    [J]. MANAGEMENT SCIENCE, 1999, 45 (02) : 273 - 289
  • [27] Scheduling unrelated parallel machines with sequence-dependent setup times
    Javad Rezaeian Zeidi
    Samir MohammadHosseini
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
  • [28] Scheduling jobs on parallel machines with sequence-dependent setup times
    Lee, YH
    Pinedo, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 464 - 474
  • [29] Integrated production planning with sequence-dependent family setup times
    Xue, Guisen
    Offodile, O. Felix
    Zhou, Hong
    Troutt, Marvin D.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 131 (02) : 674 - 681
  • [30] Sequence-Dependent Materials
    Popp, Thomas M. Osborn
    Yaghi, Omar M.
    [J]. ACCOUNTS OF CHEMICAL RESEARCH, 2017, 50 (03) : 532 - 534