Scheduling with generalized and periodic due dates under single- and two-machine environments

被引:4
|
作者
Choi, Byung-Cheon [1 ]
Kim, Kyung Min [2 ]
Min, Yunhong [3 ]
Park, Myoung-Ju [4 ]
机构
[1] Chungnam Natl Univ, Dept Business Adm, 99 Daehak Ro, Daejeon 34134, South Korea
[2] Myongji Univ, Dept Ind Management & Engn, 116 MyongJi Ro, Yongin 17058, Gyeonggi Do, South Korea
[3] Incheon Natl Univ, Grad Sch Logist, 119 Acad Ro, Incheon 22012, Gyeonggi Do, South Korea
[4] Kyung Hee Univ, Dept Ind & Management Syst Engn, 1732 Deogyeong Daero, Yongin 17104, Kyunggi Do, South Korea
基金
新加坡国家研究基金会;
关键词
Scheduling; Generalized due dates; Periodic due dates; Common due date; Computational complexity; UNARY NP-HARDNESS; COMPLETION TIMES; TOTAL DEVIATION; TARDINESS; EARLINESS; MINIMIZE;
D O I
10.1007/s11590-021-01739-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider scheduling problems such that the due date is assigned to a job, depending on its position, and the intervals between consecutive due dates are identical. The objective is to minimize the weighted number of tardy jobs or the total weighted tardiness. Both two-machine flow shop and single-machine cases are considered. We establish the computational complexity of each case, based on the relationship with the scheduling problem with a common due date.
引用
收藏
页码:623 / 633
页数:11
相关论文
共 50 条
  • [31] Metaheuristic algorithms for the two-machine flowshop scheduling problem with release dates and blocking constraint
    Agrebi, Ines
    Jemmali, Mahdi
    Alquhayz, Hani
    Ladhari, Talel
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2021, 44 (06) : 573 - 582
  • [32] A Single Machine Preemptive Scheduling Problem with Arbitrary Release Dates and Fuzzy Due Dates
    Yuan, Xie
    Ou, LinLin
    2009 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL II, 2009, : 474 - +
  • [33] Single-machine scheduling with release dates, due dates and family setup times
    Schutten, JMJ
    vandeVelde, SL
    Zijm, WHM
    MANAGEMENT SCIENCE, 1996, 42 (08) : 1165 - 1174
  • [34] Single-machine and two-machine flowshop scheduling with general learning functions
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (02) : 402 - 407
  • [35] Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
    Sung, CS
    Min, JI
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 131 (01) : 95 - 106
  • [36] Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine
    Tanaka, K
    Vlach, M
    ANNALS OF OPERATIONS RESEARCH, 1999, 86 (0) : 507 - 526
  • [37] On Two-machine Flow Shop Scheduling
    Chen L.
    Luo W.-C.
    Zhang G.-C.
    Journal of the Operations Research Society of China, 2014, 2 (03) : 333 - 339
  • [38] Two-machine flowshop batching and scheduling
    Lin, BMT
    Cheng, TCE
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 149 - 161
  • [39] Safe scheduling: Setting due dates in single-machine problems
    Baker, Kenneth R.
    Trietsch, Dan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) : 69 - 77
  • [40] Two-agent scheduling on a single machine with release dates
    Liu, Peihai
    Gu, Manzhan
    Li, Ganggang
    COMPUTERS & OPERATIONS RESEARCH, 2019, 111 : 35 - 42