共 50 条
- [31] MILP Formulation for Resource-Constrained Project Scheduling Problems [J]. 21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 880 - 884
- [35] The proactive and reactive resource-constrained project scheduling problem [J]. Journal of Scheduling, 2019, 22 : 211 - 237
- [40] Resource-Constrained Project Scheduling Problem with Modified PSO [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311