Order Production Planning Based on Lead Time and Balanced Production

被引:0
|
作者
Chen, Xin-lin [1 ]
Wang, Xiang-gang [1 ]
机构
[1] Shenzhen Inst Informat Technol, Shenzhen, Peoples R China
关键词
order; production planning; lead time; balanced production; goal programming;
D O I
10.1109/ICIEEM.2009.5344220
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the rapidly changes in the market, the businesses need to produce according to order more and more. As currently there is no order production planning based on lead time and balanced production, an order production planning model based on lead time and balanced production is proposed. It is goal programming model aiming at restraining the capacity of resources in production process, in which we firstly make use of AHP to identify the priority class, and then find the solution using MATLAB programming, at last we carry out an empirical analysis and achieve a good result.
引用
收藏
页码:994 / 998
页数:5
相关论文
共 50 条
  • [21] Order Planning and Scheduling of Rod and Wire Production Based on Gantt Chart
    Hua, Fang
    Tian, Chen
    Ying, Xie
    Yu, Sun
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 3417 - 3421
  • [22] An Improved Production Planning Approach Under the Consideration of Production Order Interdependencies
    Bendul, Julia
    Vican, Victor
    Hutt, Marc-Thorsten
    SERVICE ORIENTED, HOLONIC AND MULTI-AGENT MANUFACTURING SYSTEMS FOR INDUSTRY OF THE FUTURE, 2020, 853 : 232 - 243
  • [23] Decision Support System for Rapid Production Order Planning in Production Network
    Saniuk, Sebastian
    Saniuk, Anna
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 : 217 - 226
  • [24] Production Lots as Determinant of Paper Production Lead Time Performance
    Koskinen, Pekka
    Hilmola, Olli-Pekka
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2009, 2 (04) : 63 - 79
  • [25] Finding optimally balanced words for production planning and maintenance scheduling
    Herrmann, Jeffrey W.
    IIE TRANSACTIONS, 2012, 44 (03) : 215 - 229
  • [26] PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS
    Faicel HNAIEN
    Alexandre DOLGUI
    Mohamed-Aly OULD LOULY
    Journal of Systems Science and Systems Engineering, 2008, (02) : 132 - 155
  • [27] Planned lead time optimization in material requirement planning environment for multilevel production systems
    Faicel Hnaien
    Alexandre Dolgui
    Mohamed-Aly Ould Louly
    Journal of Systems Science and Systems Engineering, 2008, 17 : 132 - 155
  • [28] Planned lead time optimization in material requirement planning environment for multilevel production systems
    Hnaien, Faicel
    Dolgui, Alexandre
    Louly, Mohamed-Aly Ould
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2008, 17 (02) : 132 - 155
  • [29] Integrated Production Planning and Preventive Maintenance Model with Non-fixed Lead Time
    Huang, Jianqiu
    Wang, Liya
    2018 15TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION (ICARCV), 2018, : 1653 - 1658
  • [30] Lead-time planning in stochastic production system: An approach using perturbation analysis
    Feng, Ding-zhong
    Jiang, Mei-xian
    Chen, Lei-lei
    2005 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATIONS, VOLS 1-4, CONFERENCE PROCEEDINGS, 2005, : 1134 - 1138