共 50 条
- [42] Integrated Metro Train Timetabling and Rolling Stock Rescheduling Under Multi-disturbances Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2024, 24 (06): : 113 - 125
- [43] Identifying critical components for railways rolling stock reliability: a case study for Iran SCIENTIFIC REPORTS, 2024, 14 (01):
- [44] Modeling Rolling Stock Maintenance Logistics at Dutch Railways with Declarative Business Artifacts BUSINESS PROCESS MANAGEMENT WORKSHOPS (BPM 2019), 2019, 362 : 375 - 387
- [46] HOW PARAMETERS OF INFRASTRUCTURE AFFECT DESIGN OF ROLLING STOCK FOR PASSENGER TRANSPORT SOUCASNE PROBLEMY V KOLEJOVYCH VOZIDLECH, 2013, : 77 - 84
- [48] Rolling stock planning for passenger trains based on ant colony optimization Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2010, 76 (762): : 397 - 406
- [49] Passenger Acceptability of Teleoperation in Railways FUTURE TRANSPORTATION, 2022, 2 (04): : 956 - 969