Rescheduling in passenger railways: the rolling stock rebalancing problem

被引:37
|
作者
Budai, Gabriella [2 ]
Maroti, Gabor [1 ]
Dekker, Rommert [2 ]
Huisman, Dennis [2 ,3 ]
Kroon, Leo [1 ,3 ]
机构
[1] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
[2] Erasmus Univ, Inst Econometr, NL-3000 DR Rotterdam, Netherlands
[3] Dept Logist, Netherlands Railways, NL-3500 HA Utrecht, Netherlands
关键词
Railway planning; Rolling stock rescheduling; Integer linear programming; Heuristic solution methods; CIRCULATION; MODEL;
D O I
10.1007/s10951-009-0133-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the Rolling Stock Rebalancing Problem (RSRP) which arises within a passenger railway operator when the rolling stock has to be rescheduled due to changing circumstances. RSRP is relevant both in the short-term planning stage and in the real-time operations. RSRP has as input a timetable and a rolling stock circulation where the allocation of the rolling stock among the stations at the start or at the end of a certain planning period does not match with the allocation before or after that planning period. The problem is then to modify the input rolling stock circulation in such a way that the number of remaining off-balances is minimal. If all off-balances have been solved, then the obtained rolling stock circulation can be implemented in practice. For practical usage of solution approaches for RSRP, it is important to solve the problem quickly. Since we prove that RSRP is NP-hard, we focus on heuristic solution approaches: we describe two heuristics and compare them with each other on (variants of) real-life instances of NS, the main Dutch passenger railway operator. Finally, to get further insight in the quality of the proposed heuristics, we also compare their outcomes with optimal solutions obtained by solving an existing rolling stock circulation model.
引用
收藏
页码:281 / 297
页数:17
相关论文
共 50 条
  • [31] An exact and heuristic framework for rolling stock rescheduling with railway infrastructure availability constraints
    Zhu, Jia Hui
    Dollevoet, Twan
    Huisman, Dennis
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2025, 195
  • [32] A change of complex economic indicators of passenger rolling stock deterioration
    Lingaitis, Leonas Povilas
    Vaiciunas, Gediminas
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2008, (01): : 64 - 66
  • [33] ANALYSIS OF PASSENGER ROLLING STOCK FAULTS AND ITS STATISTICS IN LITHUANIA
    Gelumbickas, Gintaras
    Vaiciunas, Gediminas
    TRANSPORT, 2011, 26 (03) : 315 - 319
  • [34] OPTIMAL ROUTE FINDING AND ROLLING-STOCK SELECTION FOR THE SPANISH RAILWAYS
    Hernando, Antonio
    Roanes-Lozano, Eugenio
    Garcia-Alvarez, Alberto
    Mesa, Luis
    Gonzalez-Franco, Ignacio
    COMPUTING IN SCIENCE & ENGINEERING, 2012, 14 (04) : 82 - 89
  • [35] SOLID-STATE BATTERY CHARGER FOR PASSENGER ROLLING STOCK
    TAPAVICA, K
    BROWN BOVERI REVIEW, 1974, 61 (12): : 581 - 582
  • [36] A rolling stock circulation model for combining and splitting of passenger trains
    Fioole, Pieter-Jan
    Kroon, Leo
    Maroti, Gabor
    Schrijver, Alexander
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (02) : 1281 - 1297
  • [38] THE RAILWAYS EYE THE PASSENGER
    不详
    ECONOMIST, 1963, 209 (02): : 151 - 152
  • [39] The Passenger Traffic of Railways
    Acworth, W. M.
    ECONOMIC JOURNAL, 1902, 12 (47): : 377 - 379
  • [40] A rolling horizon for rolling stock maintenance scheduling problem with activities
    Folco, Pietro
    Sahli, Abderrahim
    Belmokhtar-Berraf, Sana
    Bouillaut, Laurent
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196