Coal Mining with Triple-section Extraction Process in Stagger Arrangement Roadway Layout Method

被引:2
|
作者
Cui, Zimo [1 ]
Liu, Baozhu [1 ]
Zhao, Jingli [2 ]
Chanda, Emmanuel [3 ]
机构
[1] China Univ Min & Technol, Sch Resource & Safety Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Beijing, Peoples R China
[3] Univ Adelaide, Sch Civil Environm & Min Engn, Adelaide, SA 5005, Australia
关键词
D O I
10.1063/1.4977275
中图分类号
O59 [应用物理学];
学科分类号
摘要
This paper introduces the Triple-section extraction process in the three-dimensional roadway layout of stagger arrangement method for longwall top-coal caving mining. This 3-D roadway layout of stagger arrangement method without coal pillars, which arranged the air intake roadway and air return roadway in different horizons, realizing the design theory transformation of roadway layout from 2D system to 3D system. And the paper makes systematic analysis to the geological, technical and economic factors, applies this new mining roadway layout technology for raising coal recovery ratio and solving the problems about full-seam mining in thick coal seam synthetically according to theoretical study and mining practice. Furthermore, the paper presents a physical simulation about inner staggered roadway layout of this particular longwall top-coal caving method.
引用
收藏
页数:4
相关论文
共 50 条
  • [41] Improvement of Continuous Lateral Surface Mining Method for Coal Extraction from Closed Mines' Pillars
    SELYUKOV, Alexey
    ZHIRONKIN, Sergey
    CEHLAR, Michal
    ACTA MONTANISTICA SLOVACA, 2020, 25 (04) : 542 - 562
  • [42] STABILITY ANALYSIS OF SURROUNDING ROCK IN THE OPERATION PROCESS OF GOB-SIDE ENTRY RETAINING IN MAIN ROADWAY UNDER COAL MINING ENVIRONMENT
    Wang, Qi
    Guo, Dongxu
    FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (05): : 4807 - 4815
  • [43] Research on reasonable layout parameters of working faces based on the concept of harmonic extraction to reduce the damage of coal seam waiting for upward mining
    Chai Jing
    Han Zhicheng
    Lv Weiming
    Zhu Haitao
    Hou Shuhong
    Scientific Reports, 13 (1)
  • [44] Research on reasonable layout parameters of working faces based on the concept of harmonic extraction to reduce the damage of coal seam waiting for upward mining
    Chai Jing
    Han Zhicheng
    Lv Weiming
    Zhu Haitao
    Hou Shuhong
    SCIENTIFIC REPORTS, 2023, 13 (01):
  • [45] A calculation method of reasonable size of coal pillar in large mining height section based on elastic theory
    Yu Y.
    Xie Z.
    Hu M.
    Shao H.
    Chang S.
    Bai Y.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (03): : 37 - 51
  • [46] Control of surface deformation and overburden movement in coal mine area by an innovative roadway cemented paste backfilling method using mining waste
    Sun, Kai
    Zhang, Jixiong
    He, Manchao
    Li, Meng
    Guo, Shijie
    SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 891
  • [47] Design of equipment system and surrounding rock control for N00 mining method without coal pillar left and roadway excavation
    Wang Y.
    He M.
    Wang Q.
    Yang J.
    Wang J.
    Liu H.
    Chen F.
    Meitan Xuebao/Journal of the China Coal Society, 2022, 47 (11): : 4011 - 4022
  • [48] Collaborative control technology of external anchor-internal unloading of surrounding rock in deep large-section coal roadway under strong mining influence
    Xie S.
    Wang E.
    Chen D.
    Jiang Z.
    Li H.
    Liu R.
    Meitan Xuebao/Journal of the China Coal Society, 2022, 47 (05): : 1946 - 1957
  • [49] Research on extraction method of ground fissures caused by mining through UAV image in coal mine areas
    Yang Q.
    Hu Z.
    Han J.
    Yang K.
    Fu Y.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (06): : 187 - 196
  • [50] Monte Carlo analytic hierarchy process for selection of the longwall mining method in thin coal seams
    Wang, C.
    Yang, S.
    Jiang, C-Y
    Wu, G-Y
    Liu, Q-Z
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2019, 119 (12) : 1005 - 1012