Coal Mining with Triple-section Extraction Process in Stagger Arrangement Roadway Layout Method

被引:2
|
作者
Cui, Zimo [1 ]
Liu, Baozhu [1 ]
Zhao, Jingli [2 ]
Chanda, Emmanuel [3 ]
机构
[1] China Univ Min & Technol, Sch Resource & Safety Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Beijing, Peoples R China
[3] Univ Adelaide, Sch Civil Environm & Min Engn, Adelaide, SA 5005, Australia
关键词
D O I
10.1063/1.4977275
中图分类号
O59 [应用物理学];
学科分类号
摘要
This paper introduces the Triple-section extraction process in the three-dimensional roadway layout of stagger arrangement method for longwall top-coal caving mining. This 3-D roadway layout of stagger arrangement method without coal pillars, which arranged the air intake roadway and air return roadway in different horizons, realizing the design theory transformation of roadway layout from 2D system to 3D system. And the paper makes systematic analysis to the geological, technical and economic factors, applies this new mining roadway layout technology for raising coal recovery ratio and solving the problems about full-seam mining in thick coal seam synthetically according to theoretical study and mining practice. Furthermore, the paper presents a physical simulation about inner staggered roadway layout of this particular longwall top-coal caving method.
引用
收藏
页数:4
相关论文
共 50 条
  • [31] Research on the layout optimization and utilization of floor gas extraction roadway: a case study in Shoushan No.1 Coal Mine, China
    Xiong Ding
    Cheng Zhai
    Jizhao Xu
    Xu Yu
    Yong Sun
    Yuzhou Cong
    Yangfeng Zheng
    Wei Tang
    Arabian Journal of Geosciences, 2022, 15 (13)
  • [32] The coal pillar design method for a deep mining roadway based on the shape of the plastic zone in surrounding rocks
    Li, Ji
    ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (12)
  • [33] The coal pillar design method for a deep mining roadway based on the shape of the plastic zone in surrounding rocks
    Ji Li
    Arabian Journal of Geosciences, 2020, 13
  • [34] Asymmetric Reinforcement Field Test of Large Section Roadway Driving Along Next Goaf in Longwall Top-coal Mining
    Xie, Fuxing
    Mei, Xing
    He, Fulian
    Zhao, Yongqiang
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (05): : 1909 - 1919
  • [35] Stability analysis of the proposed hybrid method of partial extraction for underground coal mining
    Jaiswal, Ashok
    Shrivastva, B. K.
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2012, 52 : 103 - 111
  • [36] Numerical Method for Predicting and Evaluating the Stability of Section Coal Pillars in Underground Longwall Mining
    Shan, Pengfei
    Sun, Haoqiang
    Lai, Xingping
    Dai, Jingjing
    Gao, Jianming
    Yang, Pan
    Li, Wei
    Li, Chenwei
    Yan, Chengwei
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [37] Research on the full-section anchor cable and C-shaped tube support system of mining roadway in island coal faces
    Shan, Renliang
    Huang, Pengcheng
    Yuan, Honghu
    Meng, Chi
    Zhang, Shupeng
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2022, 21 (02) : 298 - 310
  • [38] Research on Path Planning and Control Method for Secondary Autonomous Cutting of Cantilever Roadheader in a Large-Section Coal Roadway
    Wu, Jianjun
    Xu, Ziyue
    Fang, Xinqiu
    Shi, Guangliang
    Wang, Haiyan
    SUSTAINABILITY, 2023, 15 (01)
  • [39] New Method to Design Coal Pillar for Lateral Roof Roadway Based on Mining-Induced Stress: A Case Study
    Wang, Feng
    Chen, Shaojie
    Xu, Jialin
    Ren, Mengzi
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [40] Roadway backfill method to prevent geohazards induced by room and pillar mining: a case study in Changxing coal mine, China
    Zhou, Nan
    Li, Meng
    Zhang, Jixiong
    Gao, Rui
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2016, 16 (12) : 2473 - 2484