CONSTRUCTION STATUS OF SIHWA LAKE TIDAL POWER PLANT PROJECT

被引:0
|
作者
Choi, Byung Ho [1 ]
Choi, Dong Ji [2 ]
Choi, Jae Cheon [2 ]
Kim, Kyeong Ok [3 ]
机构
[1] Sungkyunkwan Univ, Dept Civil & Environm Engn, Suwon 440746, South Korea
[2] Daewoo E & C Co, Sihwa Lake Tidal Power Project, Ansan 425330, South Korea
[3] Korea Ocean Res & dev Inst, Ansan 426744, South Korea
来源
PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ASIAN AND PACIFIC COASTS, VOL 1 | 2010年
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A Tidal Power Plant (TPP) is being constructed at the middle part of the existing Sihwa Lake dike located near the southern Incheon Port in Korea. The project, which will continue until 2010, is to harness the largest tidal energy in the Kyeonggi Bay, the eastern Yellow Sea. The present paper outlines the overall project with current progress of construction. The Sihwa TPP when it is completed will have the largest installed capacity so far.
引用
收藏
页码:45 / +
页数:2
相关论文
共 50 条
  • [31] PROJECT-MANAGEMENT IN PLANT CONSTRUCTION
    MOSBERGER, E
    CHEMIE INGENIEUR TECHNIK, 1991, 63 (09) : 921 - 925
  • [32] TIDAL REGIME CHANGE DUE TO INCHON TIDAL POWER PLANT OPERATION
    Kang, Sok Kuh
    Yum, Ki-Dae
    Lee, Kwangsoo
    Park, Jin Soon
    Kim, Eun Jin
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ASIAN AND PACIFIC COASTS, VOL 4, 2010, : 329 - 335
  • [33] Research of bp neural network in power plant construction project impact evaluation model
    Niu, Dong Xiao
    Liu, Quan Gui
    Wang, Yong Li
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 913 - 918
  • [34] Assessment of the technical skills of project managers involved in the management of power plant construction in Iran
    Jaafar, Mastura
    Khalatbari, Behnam
    Rasoolimanesh, S. Mostafa
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2014, 1 (03) : 259 - 275
  • [35] Project Construction and Important Technical Innovation for Qinshan Phase Ⅲ (PHWR) Nuclear Power Plant
    Third Qinshan Nuclear Power Co.Ltd
    Engineering Sciences, 2007, (04) : 98 - 117
  • [36] Power plant project in Speyer
    不详
    BWK, 2003, 55 (09): : 16 - 16
  • [37] Risk Management Evaluation Based on Elman Neural Network for Power Plant Construction Project
    Wang, Yongli
    Niu, Dongxiao
    Xing, Mian
    ADVANCES IN INTELLIGENT INFORMATION AND DATABASE SYSTEMS, 2010, 283 : 315 - +
  • [38] Power Plant Construction Project Safety Management Evaluation with Fuzzy Neural Network Model
    Niu, Dongxiao
    Wang, Yongli
    Ma, Xiaoyong
    2008 IEEE ASIA PACIFIC CONFERENCE ON CIRCUITS AND SYSTEMS (APCCAS 2008), VOLS 1-4, 2008, : 489 - 492
  • [39] Evaluating Degree of Success in Power Plant Construction Project Based on Fuzzy Neural Network
    Huang, Yuansheng
    Liu, Qingchao
    Qu, Zilong
    Wang, Mingyan
    FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 3, PROCEEDINGS, 2008, : 206 - 210
  • [40] The Rance tidal power plant: Rebuilding the alternators
    Salvi, J
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 1997, 52 (03): : 42 - 46